Skip to content
Town of Black Mountain

Hilltop Road Repair (TOB-25003)

Solicitation: TOB-25003
Notice ID: 4e38c0166668e07e9af58596585347a1
DepartmentTown of Black MountainStateNCPostedFeb 24, 2026, 12:00 AM UTCDueMar 24, 2026, 12:00 AM UTCCloses in 10 days

Federal opportunity from Town of Black Mountain. Place of performance: NC. Response deadline: Mar 24, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$749,153,672
Sector total $749,153,672 • Share 100.0%
Live
Median
$191,909
P10–P90
$26,352$2,547,835
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($749,153,672)
Deal sizing
$191,909 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
NC, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NC20260087 (Rev 0)
Match signal: state match • county matchOpen WD
Published Jan 02, 2026North Carolina • Alexander, Buncombe, Burke +5
Rate
BLASTER
Base $20.93Fringe $0.00
Rate
CEMENT MASON/CONCRETE FINISHER
Base $14.40Fringe $0.00
+20 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 20 more rate previews.
Davis-BaconBest fitstate match • county match
NC20260087 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Alexander, Buncombe, Burke +5
Rate
BLASTER
Base $20.93Fringe $0.00
Rate
CEMENT MASON/CONCRETE FINISHER
Base $14.40Fringe $0.00
Rate
Telecommunications Technician
Base $14.67Fringe $1.67
+19 more occupation rates in this WD
Davis-Baconstate match • county match
NC20260019 (Rev 1)
Open WD
Published Jan 30, 2026North Carolina • Alamance, Alexander, Alleghany +97
Rate
CLASS A1
Base $48.48Fringe $15.34
Rate
b CLASS A2
Base $43.20Fringe $14.99
Rate
b CLASS B1
Base $41.93Fringe $14.90
+17 more occupation rates in this WD
Davis-Baconstate match • county match
NC20260079 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Buncombe, Haywood, Henderson +1
Rate
CARPENTER, Includes Form Work
Base $13.98Fringe $0.69
Rate
ELECTRICIAN
Base $15.41Fringe $3.13
Rate
LABORER: Common or General
Base $11.30Fringe $1.53
+5 more occupation rates in this WD
Davis-Baconstate match
NC20260063 (Rev 0)
Open WD
Published Jan 02, 2026North Carolina • Bladen, Cleveland, Columbus +5
Rate
PIPEFITTER (Excluding HVAC System Installation)
Base $31.66Fringe $12.69
Rate
BRICKLAYER
Base $19.09Fringe $8.73
Rate
CARPENTER (Drywall Hanging Only)
Base $18.13Fringe $1.31
+19 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Black Mountain
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

PROPOSAL FOR THE CONSTRUCTION OF HILLTOP ROAD TOB-25003 IN BUNCOMBE COUNTY, NORTH CAROLINA TOWN OF BLACK MOUNTAIN, BLACK MOUNTAIN, NORTH CAROLINAClick Here To Download the Project Manual for TOB-25003Click Here to Download the Combined Plans for TOB_25003The Bidder has carefully examined the location of the proposed work to be known as HILLTOP ROAD TOB-25003; has carefully examined the plans and specifications, which are acknowledged to be part of the proposal, the special provisions, the proposal, the form of contract, and the forms of contract payment bond and contract performance bond; and thoroughly understands the stipulations, requirements and provisions. The undersigned bidder agrees to bound upon his execution of the bid and subsequent award to him by the Town of Black Mountain in accordance with this proposal to provide the necessary contract payment bond and contract performance bond within fourteen days after the written notice of award is received by him. The undersigned Bidder further agrees to provide all necessary machinery, tools, labor, and other means of construction; and to do all the work and to furnish all materials, except as otherwise noted, necessary to perform and complete the said contract in accordance with the 2024 Standard Specifications for Roads and Structures by the dates(s) specified in the Project Special Provisions and in accordance with the requirements of the Engineer, and at the unit or lump sum prices, as the case may be, for the various items given on the sheets contained herein.The Bidder shall provide and furnish all the materials, machinery, implements, appliances and tools, and perform the work and required labor to construct and complete HILLTOP ROAD TOB-25003 in Buncombe County, for the unit or lump sum prices, as the case may be, bid by the Bidder in his bid and according to the proposal, plans, and specifications prepared by said Town of Black Mountain, which proposal, plans, and specifications show the details covering this project, and hereby become a part of this contract. The published volume entitled North Carolina Department of Transportation, Raleigh, Standard Specifications for Roads and Structures, January 2024 with all amendments and supplements thereto, is by reference incorporated into and made a part of this contract; that, except as herein modified, all the construction and work included in this contract is to be done in accordance with the specifications contained in said volume, and amendments and supplements thereto, under the direction of the Engineer.If the proposal is accepted and the award is made, the contract is valid only when signed either by the Contract Officer or such other person as may be designated to sign for the Town of Black Mountain. The conditions and provisions herein cannot be changed except over the signature of the said Contract Officer. The quantities shown in the itemized proposal for the project are considered to be approximate only. The Town of Black Mountain may increase or decrease the quantity of any item or portion of the work as may be deemed necessary or expedient. An increase or decrease in the quantity of an item will not be regarded as sufficient ground for an increase or decrease in the lump sum contract price, nor in the time allowed for the completion of the work, except as provided for the contract. Accompanying this bid is a bid bond secured by a corporate surety, or certified check payable to the order of the Town of Black Mountain, for five percent of the total bid price, which deposit is to be forfeited as liquidated damages in case this bid is accepted and the Bidder shall fail to provide the required payment and performance bonds with the Town of Black Mountain, under the condition of this proposal, within 14 calendar days after the written notice of award is received by him, as provided in the Standard Specifications; otherwise said deposit will be returned to the Bidder.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.