Leased Lit or Dark Fiber Services
Federal opportunity from School District of Oconee County. Place of performance: SC. Response deadline: Feb 25, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
SDOC will evaluate a fiber-based network infrastructure proposal for the SDOC Wide Area Network solution for campus connectivity to the Network Aggregation and Services sites within the District. SDOC will evaluate long-term bandwidth and contract options for leased lit or leased ark fiber, as defined by the FCC Second E-Rate Modernization Ruling.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.