New Elementary School on Van Buren Site Project - Bid Iss...
Federal opportunity from Public Agency. Place of performance: United States.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
The Cedar Rapids Community School District is seeking bids for the construction of a new elementary school on the Van Buren site. The project includes general construction, sprinkler, mechanical, and electrical work. The bid package includes 19 different bid packages, each covering a specific aspect of the construction project. The project is expected to start on March 5, 2026, and the construction duration is approximately 365 days.
• The bid package includes site demolition, excavation, fo... | Title: New Elementary School on Van Buren Site Project - Bid Issuance 3, Agency: Cedar Rapids Schools, State: Iowa, Open Date: 1/27/2026, Close Date: 3/5/2026, Last Updated Date: 2/27/2026
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.