Skip to content
Town of Fairfield

2025-49 Roof Replacement - Tomlinson Middle School

Solicitation: Not available
Notice ID: 4af61d262cf7da0cd5d341423a6d8b67
DepartmentTown of FairfieldStateCTPostedMay 25, 2026, 12:00 AM UTCDueNo due date postedBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from Town of Fairfield. Place of performance: CT.

Source
Open on official portal →
Solicitation
4af61d262cf7da0cd5d341423a6d8b67
Performance
Fairfield, CT
Response
No due date posted
Open on official portal →
Map for CT
Live POP
Place of performance
Fairfield, CT
State: CT
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Town of Fairfield
Agency
Not available
Subagency
Not available
Office
Purchasing
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
CT20260012 (Rev 2)
Published May 18, 2026Connecticut • Tolland
19 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 17 more rate previews.
Davis-BaconBest fitstate match
CT20260012 (Rev 2)
Open WD
Published May 18, 2026Connecticut • Tolland
Rate
ULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY
Base $66.72Fringe $38.44
Rate
GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
Base $48.67Fringe $29.80
Rate
GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
Base $53.33Fringe $29.80
+16 more occupation rates in this WD
Davis-Baconstate match
CT20260001 (Rev 2)
Open WD
Published May 18, 2026Connecticut • Fairfield, Litchfield, Middlesex +3
Rate
BRICKLAYER (BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS AND STONE MASONS)
Base $46.09Fringe $36.29
Rate
R ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COLUMBIA, COVENTRY,
Base $50.49Fringe $29.19
Rate
CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COLUMBIA, COV
Base $42.03Fringe $29.19
+60 more occupation rates in this WD
Davis-Baconstate match
CT20260019 (Rev 2)
Open WD
Published May 18, 2026Connecticut • Litchfield
Rate
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS)
Base $48.81Fringe $33.65
Rate
CARPENTER (INCLUDES FORM WORK)
Base $42.03Fringe $29.19
Rate
ELECTRICIAN
Base $47.40Fringe $36.74
+7 more occupation rates in this WD
Davis-Baconstate match
CT20260011 (Rev 2)
Open WD
Published May 18, 2026Connecticut • New London
Rate
ULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY
Base $66.72Fringe $38.44
Rate
GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
Base $48.67Fringe $29.80
Rate
GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
Base $53.33Fringe $29.80
+16 more occupation rates in this WD

Description

Public solicitation from Purchasing for 2025-49 Roof Replacement - Tomlinson Middle School. Place of performance: Fairfield, CT. Available package materials include 2025 49 Project Manual and ITB Tomlinson Middle School, 2025 49 Drawings, 2025 49 Pre Bid Sign In Sheet, 2025 49 Addendum 1, and 3 more. Review the Fairfield bid package, project documents, and addenda for complete scope and submission requirements.

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.