Parking Lot Reconstruction and Utility Improvements - GON
Federal opportunity from State of CT - DAS Procurement • Connecticut Airport Authority. Place of performance: CT. Response deadline: Feb 10, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The project consists of: the reconfiguration and construction of an approximate 130-space surface parking lot in front of the terminal building. The project includes the reclamation of the access road and approximately 70,000 square feet of the existing parking lot. New bituminous concrete pavement will be placed on the reclaimed surfaces. The remaining paved parking area will be permanently removed and replaced with grass. The project also consists of curbing, drainage, utilities (water, sewer and gas) site lighting, landscaping, EV charging stations and other site amenities. The contract time for completion of all work is within One-Hundred and Eighty (180) calendar days from the date specified in the “Notice to Proceed”.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.