BID #2026-02 Campus Electrical Distribution
Federal opportunity from Oregon Institute of Technology. Place of performance: OR. Response deadline: Mar 13, 2026.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 21 more rate previews.↓
Point of Contact
Agency & Office
Description
The Oregon Institute of Technology is accepting sealed bids for the Campus Electrical Distribution project. Files B-1 Notice.pdf B-2 Instructions to Bidders.pdf B-3 Supplemental Instructions to Bidders.pdf B-4 Bid Bond.pdf B-5 Bid Form.pdf B-6 Public Improvement Contract.pdf B-7 Supplemental General Conditions (v.072022).pdf B-8 Good Faith Effort.pdf B-9 Performance Bond.pdf B-10 Payment Bond.pdf Exhibit B - Specifications.pdf Exhibit C - Clarifications.pdf Oregon Tech General Conditions (2-1-2017).pdf Plans, Specifications, and Drawings.pdf BID #2026-02 Addendum I.pdf Exhibit A - Plans (v.02162026).pdf BID #2026-02 Pre-Bid In-Person Attendance.pdf BID #2026-02 Clarifying Questions I.pdf BID #2026-02 Clarifying Questions II.pdf BID #2026-02 Addendum II.pdf BID #2026-02 Addendum III.pdf BID #2026-02 Addendum IV.pdf BID #2026-02 Clarifying Questions III.pdf Addenda |Response to Clarifying Questions III dated March 9, 2026 attached. |Addendum III dated March 4, 2026 attached |Addendum I dated February 16, 2026 attached. |Addendum IV dated March 5, 2026 - Revised Bid Close Date and Revised Bid Form B-5. |Response to Clarifying Questions I dated February 17, 2026 attached. |Response to Clarifying Questions II dated February 23, 2026 attached |Addendum II dated March 2, 2026 attached. Additional Information Solicitation Number BID #2026-02 Emerging Small Business Opportunity Only No Notice of Intent of Sole Source No Mandatory Pre-Close Walkthrough Date and Time of the Pre-Close Walkthrough 02/17/2026 11:00am Location of the Pre-Close Walkthrough Sunset Conference Room, located in the College Union of the Oregon Institute of Technology, 3201 Campus Drive, Klamath Falls, OR 97601-8801
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.