Skip to content
Department of Transportation

McConnel Boom Mower Parts - Southwest District

Solicitation: MODOT SW 0000000034SL
Notice ID: 41c0b0e7ae7c107aea294e38bec76e6d
DepartmentDepartment of TransportationAgencySouthwest DistrictStateMOPostedMar 10, 2026, 12:00 AM UTCDueMar 17, 2026, 03:00 PM UTCCloses in 5 days

Federal opportunity from SOUTHWEST DISTRICT • Missouri Department of Transportation. Place of performance: MO. Response deadline: Mar 17, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MO20260079 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026Missouri • Platte
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
+25 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 25 more rate previews.
Davis-BaconBest fitstate match
MO20260079 (Rev 1)
Open WD
Published Jan 30, 2026Missouri • Platte
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
Rate
TILE SETTER
Base $34.09Fringe $20.36
+24 more occupation rates in this WD
Davis-Baconstate match
MO20260073 (Rev 1)
Open WD
Published Jan 30, 2026Missouri • Clinton
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
Rate
TILE SETTER
Base $34.09Fringe $20.36
+24 more occupation rates in this WD
Davis-Baconstate match
MO20260082 (Rev 1)
Open WD
Published Jan 30, 2026Missouri • Bates, Caldwell, Clay +3
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
Rate
TILE SETTER
Base $34.09Fringe $20.36
+24 more occupation rates in this WD
Davis-Baconstate match
MO20260081 (Rev 1)
Open WD
Published Jan 30, 2026Missouri • Andrew, Buchanan, De Kalb
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $43.60Fringe $33.52
Rate
BRICKLAYER
Base $40.53Fringe $16.69
Rate
TILE SETTER
Base $34.09Fringe $20.36
+21 more occupation rates in this WD

Point of Contact

Name
TERESA MITCHELL
Email
TERESA.MITCHELL@MODOT.MO.GOV
Phone
Not available

Agency & Office

Department
Missouri Department of Transportation
Agency
SOUTHWEST DISTRICT
Subagency
SOUTHWEST DISTRICT
Office
Not available
Contracting Office Address
Not available

Description

The Missouri Department of Transportation (MoDOT) Southwest District (SW District) is seeking to establish a price agreement with multiple, McConnel Boom Mower Parts Dealers for various McConnel or McConnel compatible Mower Parts on an as needed / if needed basis from Award through March 31, 2028 with three(3) one-year renewal options. This Price Agreement will be a Percent (%) discount off the Manufacturer's Suggested Retail Price MSRP). When parts are needed, MoDOT SW will use this price agreement to choose a vendor based on factors such as cost, availability, and proximity to the MoDOT shop location. This bid will be awarded on a "multiple vendor award" basis.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.