Abndnd Mn Rclmtn Decatur Twnshp, Clrfield Cnty
Federal opportunity from Department of Environmental Protection. Place of performance: PA. Response deadline: Apr 09, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 112 more rate previews.↓
Point of Contact
Agency & Office
Description
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 2,700 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Temporary Stream
Crossing, 1 L.S.
Clearing and Grubbing, 15.5 ACRE
Grading – Grading Area 1, 26,000 C.Y.
Grading – Grading Area 2, 57,000 C.Y.
Planting – Planting Preparation, 15.5 ACRE
Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.