2025-12 ITB Rooster River Flood Mitigation Project at 150 Villa Avenue
Federal opportunity from Town of Fairfield. Place of performance: CT.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 83 more rate previews.↓
Point of Contact
Agency & Office
Description
Public solicitation from Purchasing for 2025-12 ITB Rooster River Flood Mitigation Project at 150 Villa Avenue. Place of performance: Fairfield, CT. Available package materials include 2025 12 Bid Results, 2025 12 ITB Rooster River Flood Mitigation at 150 Villa Avenue, 2025 12 Technical Specifications prepared by SLR Consulting, 2025 12 Drawings prepared by SLR Consulting, and 9 more. Review the Fairfield bid package, project documents, and addenda for complete scope and submission requirements.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.