Skip to content
Department of Highway Safety and Motor Vehicles

Building Security Monitoring and Maintenance

Solicitation: Not available
Notice ID: 3d94e8e01b1e02cdf74555a514b6baad
DepartmentDepartment of Highway Safety and Motor VehiclesStateFLPostedMar 10, 2026, 12:00 AM UTCDueMar 13, 2026, 05:30 PM UTCCloses in 1 days

Federal opportunity from Department of Highway Safety and Motor Vehicles. Place of performance: FL. Response deadline: Mar 13, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for FL
Live POP
Place of performance
Tallahassee, FL
State: FL
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
FL20260202 (Rev 1)
Match signal: state matchOpen WD
Published Jan 16, 2026Florida • Duval
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $28.00Fringe $12.30
Rate
CARPENTER (Includes Drywall Hanging and Form Work)
Base $23.63Fringe $13.30
+27 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 27 more rate previews.
Davis-BaconBest fitstate match
FL20260202 (Rev 1)
Open WD
Published Jan 16, 2026Florida • Duval
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $28.00Fringe $12.30
Rate
CARPENTER (Includes Drywall Hanging and Form Work)
Base $23.63Fringe $13.30
Rate
ELECTRICIAN (Includes Low Voltage Wiring)
Base $35.60Fringe $14.97
+26 more occupation rates in this WD
Davis-Baconstate match
FL20260104 (Rev 1)
Open WD
Published Jan 16, 2026Florida • Baker
Rate
ELECTRICIAN
Base $35.60Fringe $14.97
Rate
OPERATOR: Oiler
Base $24.84Fringe $13.60
Rate
IRONWORKER, STRUCTURAL AND REINFORCING
Base $29.50Fringe $12.98
+24 more occupation rates in this WD
Davis-Baconstate match
FL20260111 (Rev 1)
Open WD
Published Jan 16, 2026Florida • Duval
Rate
ELECTRICIAN
Base $35.60Fringe $14.97
Rate
OPERATOR: Oiler
Base $24.84Fringe $13.60
Rate
IRONWORKER, STRUCTURAL
Base $29.50Fringe $12.98
+23 more occupation rates in this WD
Davis-Baconstate match
FL20260126 (Rev 1)
Open WD
Published Jan 16, 2026Florida • Nassau
Rate
ELECTRICIAN
Base $35.60Fringe $14.97
Rate
OPERATOR: Oiler
Base $23.05Fringe $13.60
Rate
IRONWORKER, STRUCTURAL
Base $29.50Fringe $12.98
+23 more occupation rates in this WD

Point of Contact

Name
Joley Owens
Email
JoleyOwens@flhsmv.gov
Phone
(850) 617-3198

Agency & Office

Department
Department of Highway Safety and Motor Vehicles
Agency
Not available
Subagency
Not available
Office
HSMV
Contracting Office Address
Not available

Description

<p>The Florida Department of Highway Safety and Motor Vehicles is issuing this notice of intended decision to enter into a single source contract. Please see the pdf document attached below.&nbsp;</p>

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.