Tioga Marine Terminal Mill & Overlay
Federal opportunity from Philadelphia Regional Port Authority. Place of performance: PA. Response deadline: Sep 05, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
All project documents and information located in PhilaPort's Bonfire Project Portal
https://philaport.bonfirehub.com/ - You must RSVP for Mandatory Pre-Bid Meeting scheduled for Tuesday, August 12, 2025, at 10 AM at Tioga Marine Terminal. RSVP to procurement@philaport.com
This project will include the milling and overlay of approximately 26,730 SY at the Tioga Marine Terminal and the replacement of pavement markings. The selected contractor will be responsible for surveying the existing pavement elevations and profiling their overlay to promote positive drainage and prevent ponding.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.