Skip to content
Correctional Industries

00515 40' x 60' POLE BUILDING

Solicitation: Not available
Notice ID: 380de5b3fb8efd759ce4110b429e9bc8
DepartmentCorrectional IndustriesStateINPostedDueApr 14, 2026, 07:00 PM UTCCloses in 43 days

Federal opportunity from Correctional Industries. Place of performance: IN. Response deadline: Apr 14, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$67,693,638,528
Sector total $67,693,638,528 • Share 100.0%
Live
Median
$335,971
P10–P90
$30,094$5,389,799
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($67,693,638,528)
Deal sizing
$335,971 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
IN
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Indiana • Benton, Carroll, Tippecanoe
CARPENTER
Base: $33.84 • Fringe: $24.21
ELECTRICIAN
Base: $27.00 • Fringe: $18.29
POWER EQUIPMENT OPERATOR Backhoe/Excavator/Trackhoe
Base: $49.05 • Fringe: $43.40
Match signal: state match
Published Jan 02, 2026
Indiana • Orange, Washington
Carpenters, including Drywall Hanging
Base: $31.38 • Fringe: $26.27
Carpenters, including Drywall Hanging
Base: $31.48 • Fringe: $25.46
ELECTRICIAN
Base: $46.14 • Fringe: $21.90
Match signal: state match
Published Jan 02, 2026
Indiana • Jackson
BRICKLAYER
Base: $35.21 • Fringe: $18.19
CARPENTER (Including Drywall Hanging)
Base: $32.43 • Fringe: $25.78
Power equipment operators: Backhoe
Base: $39.50 • Fringe: $19.28
Match signal: state match
Published Jan 02, 2026
Indiana • Boone, Brown, Hancock +6
POWER EQUIPMENT OPERATOR (Backhoe/Excavator/Trackhoe)
Base: $40.15 • Fringe: $19.25
POWER EQUIPMENT OPERATOR Bobcat/Skid Steer/Skid Loader
Base: $42.15 • Fringe: $37.20
Bulldozer
Base: $42.15 • Fringe: $36.05
Match signal: state match

Point of Contact

Name
Ransom,Donna-515
Email
DRansom@idoc.IN.gov
Phone
Not available

Agency & Office

Department
Correctional Industries
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

00515 EVENT# 86979 POLE BUILDING - 40'x60' CONTACT FOR QUESTIONS AND FOR SITE VISITS: JEFF MEECE jmeece@idoc.in.gov COMPLETE BIDS MUST BE EMAILED TO: Donna M Ransom dransom@idoc.in.gov OR FAX # 317-838-5865 Attn: Donna M Ransom COMPLETED BID PACKAGE MUST BE SUBMITTEDD BY DUE DATE & TIME. THE BID PACKAGE IS AVAILABLE FOR DOWNLOAD THROUGH THE BID DOCUMENTS LINK IN THE EVENT NAME COLUMN. THIS BID IS NOT ELIGIBLE FOR ELECTRONIC BID THROUGH THE SUPPLIER PORTAL. COMPLETE BUILDING PACKAGE TO BE BUILT ON SITE AT WABASH VALLEY CORRECTIONAL FACILITY FOR THE ICI VEHICLE WRAP OPERATION

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.