Skip to content
Greene County

Demolition New Jasper Twp.

Solicitation: RFP-D001 JASPER RD.
Notice ID: 36f4fcba532564686c911998354be36c
DepartmentGreene CountyStateOHPostedMar 09, 2026, 12:00 AM UTCDueMar 24, 2026, 12:00 AM UTCCloses in 10 days

Federal opportunity from Greene County. Place of performance: OH. Response deadline: Mar 24, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$749,153,672
Sector total $749,153,672 • Share 100.0%
Live
Median
$191,909
P10–P90
$26,352$2,547,835
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($749,153,672)
Deal sizing
$191,909 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
OH, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OH20260067 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Ohio • Holmes, Marion
Rate
BRICK POINTER/CAULKER/CLEANER
Base $35.67Fringe $24.75
Rate
TILE FINISHER
Base $30.25Fringe $23.93
+38 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 38 more rate previews.
Davis-BaconBest fitstate match
OH20260067 (Rev 0)
Open WD
Published Jan 02, 2026Ohio • Holmes, Marion
Rate
BRICK POINTER/CAULKER/CLEANER
Base $35.67Fringe $24.75
Rate
TILE FINISHER
Base $30.25Fringe $23.93
Rate
TILE SETTER
Base $35.67Fringe $24.75
+37 more occupation rates in this WD
Davis-Baconstate match
OH20260061 (Rev 0)
Open WD
Published Jan 02, 2026Ohio • Wayne
Rate
BRICK POINTER/CAULKER/CLEANER
Base $35.67Fringe $24.75
Rate
TILE FINISHER
Base $30.25Fringe $23.93
Rate
TILE SETTER
Base $35.67Fringe $24.75
+36 more occupation rates in this WD
Davis-Baconstate match
OH20260039 (Rev 0)
Open WD
Published Jan 02, 2026Ohio • Defiance
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $37.00Fringe $28.27
Rate
BRICKLAYER
Base $36.36Fringe $21.55
Rate
BRICK POINTER/CAULKER/CLEANER
Base $33.30Fringe $18.28
+32 more occupation rates in this WD
Davis-Baconstate match
OH20260055 (Rev 0)
Open WD
Published Jan 02, 2026Ohio • Scioto
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $38.05Fringe $30.87
Rate
BRICKLAYER
Base $36.60Fringe $22.85
Rate
TILE FINISHER
Base $27.87Fringe $16.31
+28 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Greene County
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

On behalf of the Greene County Department of Development, Patriot Engineering and Environmental, Inc. (Patriot) is requesting proposals for the Building Demolition of selected structures throughout Greene County, Ohio. Generally, this work will consist of demolition and permanent removal of existing structures at the property locations identified in this Request for Proposal (RFP). This work is being performed under a grant agreement between the Greene County Department of Development and the Ohio Department of Development (ODOD) under the Building Demolition and Site Revitalization Program. Detailed information concerning the RFP, including the scope of work, due date for submittal, and prebid meeting, submittal procedures, requests...

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.