Skip to content
Public Agency

Field Corn Seed RFQ

Solicitation: Not available
Notice ID: 3482e5c6c91da5d77b69b897597e0160
DepartmentPublic AgencyStateAKPostedDueNo due date posted

Federal opportunity from Public Agency. Place of performance: AK.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,912,205,491
Sector total $1,912,205,491 • Share 100.0%
Live
Median
$168,000
P10–P90
$28,970$2,500,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,912,205,491)
Deal sizing
$168,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
AK, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
AK20260006 (Rev 0)
Match signal: state matchOpen WD
Published Jan 16, 2026Alaska • Anchorage, Bethel, Bristol Bay +16
Rate
CARPENTER North of 63 Latitude
Base $50.79Fringe $26.32
Rate
South of N63 Latitude
Base $50.79Fringe $26.86
+36 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 36 more rate previews.
Davis-BaconBest fitstate match
AK20260006 (Rev 0)
Open WD
Published Jan 16, 2026Alaska • Anchorage, Bethel, Bristol Bay +16
Rate
CARPENTER North of 63 Latitude
Base $50.79Fringe $26.32
Rate
South of N63 Latitude
Base $50.79Fringe $26.86
Rate
CEMENT MASON/CONCRETE FINISHER
Base $49.28Fringe $22.28
+35 more occupation rates in this WD
Davis-Baconstate match
AK20260005 (Rev 0)
Open WD
Published Jan 02, 2026Alaska • Bethel, Bristol Bay, Dillingham +9
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $53.23Fringe $29.50
Rate
GROUP 1A
Base $55.33Fringe $29.50
Rate
GROUP 2
Base $52.32Fringe $29.50
+31 more occupation rates in this WD
Davis-Baconstate match
AK20260003 (Rev 0)
Open WD
Published Jan 02, 2026Alaska • Denali, Fairbanks North Star, Nome +3
Rate
POWER EQUIPMENT OPERATOR (1)Backhoe: 3 yards and under
Base $53.23Fringe $29.50
Rate
Bulldozer
Base $53.23Fringe $29.50
Rate
Mechanic
Base $53.23Fringe $29.50
+11 more occupation rates in this WD
Davis-Baconstate match
AK20260004 (Rev 0)
Open WD
Published Jan 02, 2026Alaska • Anchorage
Rate
CARPENTER (excluding drywall hanging and batt and blown insulation)
Base $15.85Fringe $0.00
Rate
including cement finishing)
Base $21.30Fringe $0.00
Rate
ELECTRICIAN
Base $22.99Fringe $0.00
+7 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Public Agency
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

Field Corn Seed RFQ

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.