CITY OF TOMBALL DOWNTOWN BOLLARD PLAN
Federal opportunity from AIG Technical Services LLC. Place of performance: TX. Response deadline: Mar 24, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 43 more rate previews.↓
Point of Contact
Agency & Office
Description
Work of the contract is for the construction of Bollards in the City of Tomball downtown area. Project Bid No. 2026-04, City of Tomball Project No. 2026-100002. The work included in this project consists of furnishing labor, materials, equipment, supervision, and related items for construction. The project includes removal and replacement of existing concrete or asphalt pavement to install removable bollards with lifting handles.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.