Skip to content
Department of Transportation

Grounds Maintenance Services

Solicitation: MODOT SL 0000000057SL
Notice ID: 31ca5129774e0b3b0e8a368a0eb8c626
DepartmentDepartment of TransportationAgencySt Louis DistrictStateMOPostedMar 04, 2026, 12:00 AM UTCDueMar 11, 2026, 03:00 PM UTCCloses in 7 days

Federal opportunity from ST LOUIS DISTRICT • Missouri Department of Transportation. Place of performance: MO. Response deadline: Mar 11, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,310,325,434
Sector total $1,310,325,434 • Share 100.0%
Live
Median
$227,621
P10–P90
$31,601$2,474,119
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,310,325,434)
Deal sizing
$227,621 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 30, 2026
Missouri • Chariton
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base: $45.60 • Fringe: $35.47
BRICKLAYER
Base: $32.79 • Fringe: $21.31
TILE SETTER
Base: $32.79 • Fringe: $21.31
Match signal: state match
Published Jan 30, 2026
Missouri • Andrew, Buchanan, De Kalb
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base: $43.60 • Fringe: $33.52
BRICKLAYER
Base: $40.53 • Fringe: $16.69
TILE SETTER
Base: $34.09 • Fringe: $20.36
Match signal: state match
Published Jan 30, 2026
Missouri • Bates, Caldwell, Clay +3
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base: $43.60 • Fringe: $33.52
BRICKLAYER
Base: $40.53 • Fringe: $16.69
TILE SETTER
Base: $34.09 • Fringe: $20.36
Match signal: state match
Published Jan 30, 2026
Missouri • Clinton
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base: $43.60 • Fringe: $33.52
BRICKLAYER
Base: $40.53 • Fringe: $16.69
TILE SETTER
Base: $34.09 • Fringe: $20.36
Match signal: state match

Point of Contact

Name
STEPHANIE LEWIS
Email
STEPHANIE.LEWIS@MODOT.MO.GOV
Phone
Not available

Agency & Office

Department
Missouri Department of Transportation
Agency
ST LOUIS DISTRICT
Subagency
ST LOUIS DISTRICT
Office
Not available
Contracting Office Address
Not available

Description

This solicitation seeks quotations from qualified companies who can provide grounds maintenance services to MoDOT St. Louis District Office and Transportation Management Center (TMC). Contract Period: April 1, 2026 - March 31, 2027 with the option to renew for two (2) one-year periods.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.