Trinity River Authority of Texas - Technical Proposal - Denton Creek Regional Wastewater System 25HC-4 & 25HC-5 Henrietta Creek Relief Interceptor
Federal opportunity from Trinity River Authority of Texas. Place of performance: TX. Response deadline: Apr 23, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 45 more rate previews.↓
Point of Contact
Agency & Office
Description
The Project scope includes the following major items: 11,037 linear feet of sewer pipe – Open Cut, 1309 linear feet of sewer – MOTOC, 34 Manholes, and 2 meter stations. Contract Documents for the Project can be downloaded at the following website: www.civcastusa.com . Direct questions for the Project through CivCast. Only responses issued via Addenda are binding. One non-mandatory airport site visit will be conducted at Perot Field Fort Worth Alliance Airport at 13901 Aviator Way, Fort Worth, TX 76177 on Friday, March 13, 2026 from 11:00 AM to 12:00 PM. Specific details will be presented during the mandatory Pre-Proposal Meeting.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.