Skip to content
West Sound Utility District

Invitation to Bid - Olney Ave Sewer Replacement (2026)

Solicitation: Not available
Notice ID: 2fcd85554f27b7685c6c1bb3239893bf
DepartmentWest Sound Utility DistrictStateWAPostedFeb 18, 2026, 12:00 AM UTCDueApr 02, 2026, 12:00 AM UTCCloses in 19 days

Federal opportunity from West Sound Utility District. Place of performance: WA. Response deadline: Apr 02, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$749,153,672
Sector total $749,153,672 • Share 100.0%
Live
Median
$191,909
P10–P90
$26,352$2,547,835
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($749,153,672)
Deal sizing
$191,909 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
WA, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
WA20260114 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Washington • Spokane
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $75.37Fringe $18.82
Rate
TILE FINISHER
Base $27.26Fringe $11.99
+42 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 42 more rate previews.
Davis-BaconBest fitstate match
WA20260114 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Spokane
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $75.37Fringe $18.82
Rate
TILE FINISHER
Base $27.26Fringe $11.99
Rate
TILE SETTER
Base $36.35Fringe $14.57
+41 more occupation rates in this WD
Davis-Baconstate match
WA20260138 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Columbia, Franklin
Rate
CARPENTER
Base $44.21Fringe $17.28
Rate
Line Construction: LINE PERSON
Base $64.17Fringe $23.58
Rate
TREE TRIMMER: Ground Person
Base $22.60Fringe $16.37
+39 more occupation rates in this WD
Davis-Baconstate match
WA20260021 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Adams
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Including Drywall Hanging and Form Work)
Base $44.21Fringe $17.28
+28 more occupation rates in this WD
Davis-Baconstate match
WA20260026 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Grant
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Including Drywall Hanging and Form Work)
Base $44.21Fringe $17.28
+27 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
West Sound Utility District
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

INVITATION FOR BIDS Sealed bids will be received by West Sound Utility District (“District”) at the District office located at 2924 SE Lund Avenue, Port Orchard, Washington, 98366, until 2:00 P.M. on Thursday,April 2, 2026 for the Olney Avenue Sewer Replacement project. The scope of work consists of installing approximately 1,750 linear feet of 18-inch high-density polyethylene (HDPE) dimension ratio (DR) 17 gravity sewer main and 8-inch HDPE DR 17 gravity sewer main using pipe bursting to replace existing 15-inch concrete pipe along Olney Avenue SE, in the approximate reference area of SE Horstman Road and approximately 400 feet north of East Illinois Street, and replacing existing 6-inch concrete pipe along East Illinois Street. The Work will also consist of installing approximately 865 linear feet of 18-inch polyvinyl chloride (PVC) and 8-inch PVC gravity sewer main using open trench construction methods, 345 linear feet of 6-inch side sewers, 13 manholes, 15 cleanouts, and general restoration. The Work will be split into two (2) Schedules with Schedule A including the Work within the City of Port Orchard’s jurisdiction and Schedule B including the Work within Kitsap County’s jurisdiction. All Work shall be physically complete within 100 working days after receiving the Notice to Proceed. All bidding and construction shall be performed in compliance with the Contract and Drawings for this Project and any addenda issued thereto. Free-of-charge access to project bid documents (Drawings, Specifications, Addenda, and Bidders List) is provided to Prime Bidders, Subcontractors, and Vendors by going to www.bxwa.com and clicking on "Posted Projects", "Public Works", "West Sound Utility District", and "Projects Bidding". This online plan room provides Bidders with fully usable online documents with the ability to: download, view, print, order full/partial plan sets from numerous reprographic sources, and a free online digitizer/take-off tool. It is recommended that Bidders "Register" to receive automatic e-mail notification of future addenda and to place themselves on the "Self-Registered Bidders List". Bidders that do not register will not be automatically notified of addenda and will need to periodically check the on-line plan room for addenda issued on this project. Contact Builders Exchange of Washington at (425) 258-1303 should you require assistance with access or registration. The content available through bxwa.com is our property or the property of our licensors and is protected by copyright and other intellectual property laws. Access to project documents is intended for use by bidders (general contractors/prime bidders, subcontractors and suppliers), agency personnel and agency's consultants, as well as for personal, noncommercial, use by the public. You may display or print the content available for these uses only. "Harvesting" (downloading, copying, and transmitting) of any project information and/or project documents for purposes of reselling and/or redistributing information by any other party is not allowed by BXWA. The bids will be publicly opened and read aloud shortly after the time and date stated above. Bids are to be submitted only on the forms provided with the Bid Documents. Bids received after such time and date will not be considered. No Bidder may withdraw a bid after the deadline for the submittal of bids. Bids properly received will be publicly opened and read at the District office following the deadline for the submission of bids. Bids shall be submitted in accordance with the Contract Documents. Bids shall constitute offers to the District which shall be binding for 30 days from the date of bid opening. Inquiries regarding the Project shall be directed to Kevin Aguilar, PE, BHC Consultants, at telephone number (206) 357-9967 or email: Kevin.Aguilar@bhcconsultants.com . Bidders are required to submit all questions in writing and all questions must be submitted by 1:00 P.M.local time on Thursday, March 26, 2026. No oral responses to questions by District personnel about the bid will be binding on the District. Bid Security: All bids must be accompanied by a certified check or bank cashier’s check, surety bond, or postal money order payable to West Sound Utility District in an amount not less than five percent (5%) of the total bid amount. Rejection of Bids: The District reserves the right to reject any bid, any portion of any bid and/or to reject all bids. The District further reserves the right, but without obligation, to waive incomplete, informalities, irregularities, or nonresponsive. West Sound Utility District is an equal opportunity employer. All work performed on the Project will be subject to State Prevailing Wage Rates. All Contractors and Subcontractors must be licensed in the State of Washington to conduct business.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.