Skip to content
Public Agency

Z2DA--Install Humidification Monitoring and Control for P...

Solicitation: 02Bqt46z1t92vyEPtX5A
Notice ID: 2dce772e922e2adeda622d070f936739
Contract snapshot

Federal opportunity from Public Agency. Place of performance: United States.

Source
Open on official portal →
Solicitation
02Bqt46z1t92vyEPtX5A
Performance
United States
Response
No due date posted
Open on official portal →
Live POP
Place of performance
United States
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Public Agency
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
No direct WD match was found yet for this notice. Review the WD directory for state/county coverage and verify on SAM.gov.

Description

The project involves installing humidification monitoring and control systems for a pharmacy cache. The work includes furnishing, installation, connection, and testing of electrical conductors and cables for use in electrical systems rated 600 V and below. The contractor must ensure that the installation meets the requirements of the National Electrical Code (NEC) and other applicable standards. The project also involves splicing and terminating conductors, installing control wiring, and perf... | Title: Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache, Agency: U.S. Department Of Veterans Affairs, State: Colorado, Open Date: 12/31/2025, Close Date: 3/16/2026, Last Updated Date: 3/9/2026

Advisory bid range

Pricing and bid posture

high confidence
$625,611 - $741,464

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$625,611
Target
$662,022
Premium
$741,464
Labor
$329,680
Direct
$32,000
Burden
$221,360
Fee + reserve
$78,022
Target $662,022Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity involves installing humidification monitoring and control systems for a pharmacy cache, requiring a contractor to manage the furnishing, installation, connection, and testing of electrical components rated 600 V and below. This project falls under the jurisdiction of the U.S. Department of Veterans Affairs and is scheduled to open on December 31, 2025, with a response deadline of March 16, 2026. Contractors must adhere to the National Electrical Code (NEC) among other requirements, making specialized electrical expertise crucial.

humidification systemselectrical installationNEC compliancepharmacy cachecontrol wiring
What the buyer is trying to do

The buyer aims to enhance the environmental conditions of a pharmacy cache by installing effective humidification monitoring and control systems, ensuring compliance with electrical safety standards.

Who should pursue this
  • Electrical contractors with experience in commercial installations
  • Firms proficient in NEK compliance and HVAC humidification systems
  • Licensed contractors with prior work in healthcare-related projects
Work breakdown
  • Furnishing materials for humidification system
  • Installation of monitoring and control systems
  • Connection of electrical conductors rated 600 V and below
  • Testing of complete electrical and control systems
  • Splicing and terminating electrical conductors
  • Installing control wiring for the system
Response package checklist
  • Bid proposal including company qualifications
  • Detailed project timeline
  • Compliance with NEC documentation
  • Cost estimate and pricing details
  • Evidence of relevant project experience
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Installation must meet NEC standards
  • Compliance with local and state electrical codes
Pricing strategy
  • Consider competitive pricing based on historical data from similar projects
  • Include cost for compliance assessment and testing procedures
Teaming and subs
  • Electrical engineering firms for design support
  • HVAC specialists for integrated system performance
  • Local subcontractors for installation to minimize travel costs
Risks and watchouts
  • Potential delays in material acquisition
  • Risk of cost overruns due to compliance requirements
  • Need for coordination with other ongoing construction activities in healthcare settings
Smart questions to ask
  • What is the budget allocation for the project?
  • Are there specific deadlines for material submissions before the deadline?
  • Can you clarify the expectations for testing and compliance documentation?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific budget range provided
  • Details on place of performance are absent
  • No background on previous related projects
  • Information on available contractor resources not mentioned
  • Request for proposal guidelines not detailed
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice 02BQT46Z1T92VYEPTX5A
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.