Skip to content
Military Department

Certified SB, including MB, SB-PW, or DVBE Only** or **Certified DVBE Only** IFB No. 126802 Backflow Installation, Seaside National Guard Armory

Solicitation: Not available
Notice ID: 1f27a3440e926f0da02c3c5ed0f17fbf
Set-AsideSB-PW/SB/DVBE/MBDepartmentMilitary DepartmentStateCAPostedMar 09, 2026, 12:00 AM UTCDueMar 23, 2026, 09:00 PM UTCCloses in 11 days

Federal opportunity from Military Department. Place of performance: CA. Response deadline: Mar 23, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Monterey County
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CA20260026 (Rev 2)
Match signal: state matchOpen WD
Published Jan 23, 2026California • San Bernardino
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
+130 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 130 more rate previews.
Davis-BaconBest fitstate match
CA20260026 (Rev 2)
Open WD
Published Jan 23, 2026California • San Bernardino
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+129 more occupation rates in this WD
Davis-Baconstate match
CA20260012 (Rev 2)
Open WD
Published Jan 23, 2026California • San Luis Obispo
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+128 more occupation rates in this WD
Davis-Baconstate match
CA20260024 (Rev 2)
Open WD
Published Jan 23, 2026California • Orange
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD
Davis-Baconstate match
CA20260025 (Rev 2)
Open WD
Published Jan 23, 2026California • Riverside
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+123 more occupation rates in this WD

Point of Contact

Name
Nicole Jackson
Email
nicole.jackson@cmd.ca.gov
Phone
Not available
Name
Nicole Jackson
Email
nicole.jackson@cmd.ca.gov
Phone
Not available

Agency & Office

Department
Military Department
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

The Contractor shall provide all materials, labor, bonds, licenses, insurance, equipment, tools, permits, taxes, transportation, and fees to install two new reduced pressure principle backflow prevention assmblies (RPBAs) at the Seaside National Guarrd. All work shall be in accordance with the terms, conditions, and requirements of this Invitation for Bid (IFB). Bid submissions shall be emailed to PWC@cmd.ca.gov and shall include the Contracting Analyst listed in this IFB as a copied recipient. Subject line must include the IFB No. 126802, Backflow Installation and Contractor Business Name. Prospective bidders MAY attend the mandatory pre-bid job walk on 3/11/2026, at 11:00 AM at Seaside National Guard Armory, 140 Col Durham Rd, Seaside, CA 93955. Arrive at least 15 minutes early and bring business cards. Failure to arrive at the designated meeting location by the scheduled start time may result in disqualification from submitting a bid. Bidders who do not remain for the entire pre-bid job walk may be considered non-responsive and may not be allowed to bid on this project. Prospective bidders may obtain directions to the pre-bid job walk site by contacting Nicole Jackson at Nicole.Jackson@cmd.ca.gov. The prime contractor MUST possess a type C-36 - Plumbing Contractor license. All questions regarding this IFB MUST be submitted to Nicole Jackson at Nicole.Jackson@cmd.ca.gov no later than 5:00 PM on 3/13/2026. Email subject lines must reference IFB No. 126802. If an addendum is necessary, it will be issued prior to the Bid Submission Deadline. The bid opening will be held on 3/20/2026 at 2:15 PM. Backflow Installation PRE-BID JOB WALK: 3/11/2026 at 11:00 AM Q&A END: 3/13/2026 at 5:00 PM BID SUBMISSION DEADLINE: 3/23/2026 at 2:00 PM BID OPENING: 3/23/2026 at 2:15 PM

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.