Pine Lake Fishing Pier
Federal opportunity from St. Croix County. Place of performance: WI. Response deadline: Mar 24, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 120 more rate previews.↓
Point of Contact
Agency & Office
Description
Croix County is open to different decking options depending on cost and maintenance. At this time, we don’t intend on including any benches, but they could be included in the proposal as an option. Water depths at the end of the pier could vary from 6-10’ depending on water level. The County would like to have the pier installed by July 1 st. More information can be found in the attached documents.Issue for bid: February 24, 2026.Bids due: March 24, 2026.Contract awarded: March 31, 2026.St. Croix County is requesting this project to be completed by: July 1, 2026.Submit (1) bid to: St. Croix County Community Development Department 1101 Carmichael Rd, Suite 1300, Hudson, WI 54016 referencing “SEALED BID for Pine Lake Fishing Pier” or b...
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.