2025-36 ITB Twin Brooks Lane Slope Stabilization, Scour and Minor Culvert Repairs
Federal opportunity from Town of Fairfield. Place of performance: CT.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 81 more rate previews.↓
Point of Contact
Agency & Office
Description
Public solicitation from Purchasing for 2025-36 ITB Twin Brooks Lane Slope Stabilization, Scour and Minor Culvert Repairs. Place of performance: Fairfield, CT. Available package materials include 2025 36 ITB Twin Brooks Lane Slope Stabilization, Scour and Minor Culvert Repairs, 2025 36 Pre Bid Sign In Sheet, 2025 36 Addendum 1, 2025 36 Results. Review the Fairfield bid package, project documents, and addenda for complete scope and submission requirements.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.