Asbestos Project Design, Air Monitoring & Abatement
Federal opportunity from City of Sumter. Place of performance: SC. Response deadline: Feb 12, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The “Asbestos Project Design” shall be a written plan prepared by a certified asbestos project designer specifying how the asbestos abatement project will be performed (for each house) including, but not limited to, a scope of work and technical specifications. The project design must comply with 40 CFR 763.90 (9) Federal Register and SCDHEC regulations.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.