Renton High School Replacement - MACC 01 - Phase 1
Federal opportunity from Ben Franklin Transit. Place of performance: WA. Response deadline: Apr 21, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 37 more rate previews.↓
Point of Contact
Agency & Office
Description
Renton High School Replacement - MACC 01 - Phase 1 Invitation to BidRenton High School Replacement Phase 1: MACC 01 - Main Construction Bid Group 1: BP 02A - DEMOLITIONBP 21A – FIRE PROTECTION BP 31A – EARTHWORK & UTILITIESBP 31D – PHASE 1 ASPHALT & STRIPINGBP 32B – EARLY WORK SITE CONCRETEBP 32C – PHASE 1 LANDSCAPE Sealed bids will be received by Renton School District and Skanska U.S.A. Building, Inc. for construction subcontracts to the GC/CM Contract between Skanska U.S.A. Building, Inc. and Renton School District for the above listed Scopes of Work. Deliver sealed bids to: Renton School District FOMC 7812 S 124th St, Seattle, WA 98178 Attention: Josiah Mooi - Project Manager / Skanska USA Building Bid Dates and Times are as stated belo...
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.