Skip to content
City of Manchester

FY26 130 41RFP

Solicitation: Not available
Notice ID: 1688230104cd1f3e080dbabe9b850ecf
DepartmentCity of ManchesterStateNHPostedMar 11, 2026, 12:00 AM UTCDueNo due date posted

Federal opportunity from City of Manchester. Place of performance: NH.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$247,569,801
Sector total $247,569,801 • Share 100.0%
Live
Median
$178,459
P10–P90
$34,174$656,980
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($247,569,801)
Deal sizing
$178,459 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for NH
Live POP
Place of performance
Manchester, NH
State: NH
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NH20260019 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026New Hampshire • Merrimack
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $44.36Fringe $36.63
Rate
ELECTRICIAN
Base $36.12Fringe $22.92
+14 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 14 more rate previews.
Davis-BaconBest fitstate match
NH20260019 (Rev 0)
Open WD
Published Jan 02, 2026New Hampshire • Merrimack
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $44.36Fringe $36.63
Rate
ELECTRICIAN
Base $36.12Fringe $22.92
Rate
IRONWORKER, STRUCTURAL
Base $33.65Fringe $26.12
+13 more occupation rates in this WD
Davis-Baconstate match
NH20260020 (Rev 0)
Open WD
Published Jan 02, 2026New Hampshire • Cheshire, Sullivan
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $44.36Fringe $36.63
Rate
ELECTRICIAN
Base $36.12Fringe $22.92
Rate
IRONWORKER, STRUCTURAL
Base $33.65Fringe $26.12
+13 more occupation rates in this WD
Davis-Baconstate match
NH20260007 (Rev 0)
Open WD
Published Jan 02, 2026New Hampshire • Coos
Rate
ELECTRICIAN
Base $47.58Fringe $29.90
Rate
CARPENTER
Base $22.50Fringe $3.32
Rate
LABORER: Common or General
Base $21.29Fringe $2.48
+6 more occupation rates in this WD
Davis-Baconstate match
NH20260003 (Rev 1)
Open WD
Published Jan 30, 2026New Hampshire • Hillsborough, Rockingham
Rate
Dredging: CLASS A1
Base $48.48Fringe $15.34
Rate
b CLASS A2
Base $43.20Fringe $14.99
Rate
b CLASS B1
Base $41.93Fringe $14.90
+4 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Manchester
Agency
Not available
Subagency
Not available
Office
Purchasing
Contracting Office Address
Not available

Description

FY26 130 41RFP

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.