AMRP, Sandy Cr No 1, Covington Tp, Clearfield Cnty
Federal opportunity from Department of Environmental Protection. Place of performance: PA. Response deadline: Mar 19, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 112 more rate previews.↓
Point of Contact
Agency & Office
Description
The principal items of work and approximate quantities are:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 8,197 L.F.
Clearing and Grubbing, 157.6 ACRE
Grading – Grading Area 1, 1,649,134 C.Y.
Grading – Grading Area 2, 81,0003 C.Y.
Grading – Hummocky Piles, 6.3 ACRE
Grading – Ripping, 32.2 ACRE
Planting – Planting Preparation, 157.6 ACRE
Planting – Tree Seedlings, 26,172 EACH
Planting – Mulching, 119.1 ACRE
Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity is for the implementation of an Erosion and Sediment Pollution Control Plan under solicitation number OSM 17(0115,6422)103.1, issued by the Department of Environmental Protection. The project involves significant earthworks including grading over 1.6 million cubic yards and planting over 26,000 tree seedlings. Proposals are due on March 19, 2026, providing a tight timeline for preparation and submission.
The buyer aims to control erosion and sediment pollution through extensive grading and planting efforts in Clearfield County, Pennsylvania.
- Contractors with experience in environmental remediation and erosion control
- Firms with capabilities in large-scale grading operations
- Companies specializing in forestry or landscape restoration
- Implement Erosion and Sediment Pollution Control Plan – Rock Construction Entrance (2 units)
- Implement Erosion and Sediment Pollution Control Plan – Compost Filter Sock (8,197 linear feet)
- Clearing and Grubbing (157.6 acres)
- Grading – Grading Area 1 (1,649,134 cubic yards)
- Grading – Grading Area 2 (81,000 cubic yards)
- Grading – Hummocky Piles (6.3 acres)
- Grading – Ripping (32.2 acres)
- Planting Preparation (157.6 acres)
- Plant Tree Seedlings (26,172 units)
- Planting – Mulching (119.1 acres)
- Completed bid form
- Proof of relevant experience and expertise
- Environmental certifications
- Project timeline and scheduling
- Bid pricing details
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Compliance with state environmental regulations is required.
- Bidders must adhere to the specifications set forth in the bid documents.
- Competitive pricing is crucial given the scale of physical work required.
- Consideration for material costs associated with planting and earthworks.
- Consider partnering with local environmental specialists and subcontractors with specific experience in sediment control and planting.
- Potential to team with logistics firms for material transport.
- Timing constraints with a short proposal period (less than a month).
- Risk of underestimating the quantity of materials needed for grading and planting.
- Compliance risks related to environmental regulations.
- What specific environmental permits are required for this project?
- Are there any existing contracts or partnerships that could affect bidding?
- What is the projected timeline for the start of work after award?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specifics on the site location or access conditions.
- No details on potential subcontracting rules or limitations.
- Lack of information on previous contracts or performance requirements.
- No indications of funding or budget constraints.
- No insights into competition or bidding history.
- No criteria for evaluation of proposals.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.