Skip to content
City of Westfield

Construction of Skate Park

Solicitation: Bid #26-030
Notice ID: 0e41927b1871d4ceaabaf5ddbedf5ff7
DepartmentCity of WestfieldStateMAPostedMar 25, 2026, 12:00 AM UTCDueApr 14, 2026, 12:00 AM UTCCloses in 2 days

Federal opportunity from City of Westfield. Place of performance: MA. Response deadline: Apr 14, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,216,052,645
Sector total $7,216,052,645 • Share 100.0%
Live
Median
$244,661
P10–P90
$30,957$1,422,150
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,216,052,645)
Deal sizing
$244,661 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
MA, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260011 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
+55 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 55 more rate previews.
Davis-BaconBest fitstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260016 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Westfield
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

Written proposals addressed to the City Purchasing Department, City Hall, 59 Court Street, Westfield, Massachusetts and endorsed “Westfield Skate Park – Bid 25-030” will be received by the Purchasing Department in the Purchasing Office, Room 101 of City Hall, until 3:00 PM, Wednesday, April 14, 2026 and at that time publicly opened and read aloud. Bids received after the time of announced open-ing will not be accepted.All bidders are encouraged to view the site but no pre-bid meeting will be held.The work under this Contract generally includes the removal of existing skate park and construction of new one. A proposal guarantee of 5% of the Bid shall be required. Performance and Payment Bonds shall be 100% of the Contract Amoun...

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.