REQUEST FOR PROPOSALS
Federal opportunity from Hoke County. Place of performance: NC. Response deadline: Apr 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 19 more rate previews.↓
Point of Contact
Agency & Office
Description
Printable Copy (Click Here)REQUEST FOR PROPOSALS (RFP)Engineering/Design Services (PE) for Hoke Walks Trail SystemJames A. Leach Aquatic and Recreation Center – Hoke County, NCProject: Hoke WalkIssue Date: March 3, 2026Proposal Due Date: April 3, 2026________________________________________1. General InformationThe County of Hoke (hereafter “County”) has been awarded funding through the North Carolina Department of Transportation (NCDOT) to complete the design and engineering of a new pedestrian trail system as part of the Hoke Walks initiative. The project area is located behind the James A. Leach Aquatic and Recreation Center at 5215 Fayetteville Road, Raeford, NC. The proposed trail system will connect to Beaumont Court and Chamberlin Boulevard, enhancing non-motorized connectivity within the area.The County is soliciting sealed proposals from qualified engineering firms to provide professional design services for the trail project in accordance with NCDOT and Federal Highway Administration (FHWA) requirements.2. Scope of WorkThe selected consultant shall provide full design and engineering services, including but not limited to:• Field surveying, topographic mapping, and geotechnical review• Trail layout and design consistent with NCDOT and AASHTO standards for multi-use paths• ADA compliance and environmental sensitivity• Trailhead and wayfinding considerations• Drainage and erosion control planning• Utility conflict identification• Design for tie-ins to Beaumont Court and Chamberlin Boulevard• Coordination with County staff, public stakeholders, and NCDOT Division 8• Cost estimating, phasing, and construction drawings suitable for bidding• Support during permitting and pre-construction review________________________________________3. Project Location• Primary Location: Behind the James A. Leach Aquatic & Recreation Center (5215 Fayetteville Rd, Raeford, NC 28376)• Trail Connections:o Beaumont Courto Chamberlin BoulevardTrail alignment is to be determined during the design phase but must remain within county-owned or approved easement areas.4. Funding SourceThis project is funded through an NCDOT-administered grant and is subject to federal and state procurement rules, including:• NCDOT’s Locally Administered Projects Program (LAPP)• Title VI of the Civil Rights Act of 1964• Uniform Administrative Requirements (2 CFR Part 200)• Buy America and Davis-Bacon compliance (if applicable)5. Proposal Submission RequirementsFirms must submit five (5) hard copies and one (1) digital PDF containing:• Cover Letter• Firm qualifications and relevant experience• Key personnel with resumes and availability• Detailed project understanding and proposed methodology• Recent similar projects and references• Project schedule with milestones• Hourly rate and fee proposal (in separate sealed envelope)• Required certifications and forms (Section 7)6. Evaluation CriteriaCriteria WeightRelevant Experience 25%Qualifications of Key Personnel 20%Project Approach & Methodology 25%Schedule and Availability 15%Past Performance with NCDOT/FHWA 15%Note: This is a qualifications-based selection under N.C.G.S. 143-64.31; cost proposals will be reviewed after ranking of qualifications.7. Required Assurances and FormsInclude the following completed and signed:• Conflict of Interest Statement• Certification Regarding Debarment & Suspension• E-Verify Affidavit• Non-Collusion Affidavit• Title VI Assurance Form (NCDOT)8. Questions and AddendaSubmit all questions in writing by to:C. Andrew Jacobs IIEmail: document.write('cjacobs'+'@'+'hokecounty.org') cjacobs@hokecounty.org For security reasons, you must enable JavaScript to view this E-mail address.Responses and addenda will be posted at https://www.hokecounty.net/Bids.aspx9. Submission Deadline and Delivery AddressAll proposals must be received by:April 3, 2026, by 10AM Late proposals will not be accepted.Deliver to:Hoke County Attn: Andrew Jacobs227 N. Main StreetRaeford, NC 28376Hoke County reserves the right to reject any or all proposals, waive informalities, and select the firm that is in the best interest of the County and in compliance with NCDOT and FHWA regulations.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.