Theme Park Substation Transformer Replacement
Federal opportunity from Central Florida Tourism Oversight District. Place of performance: FL. Response deadline: Mar 19, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
<p>A <strong>non</strong>-<strong>mandatory</strong> site visit will be conducted on <strong>Thursday, March 12, 2026 at 08:30 A.M.</strong> Meeting location for the site visit is at the following address:</p><p>Large Maintenance Conference Room </p><p>5300 N. Center Drive, Lake Buena Vista, Florida 32830</p><p><strong>All attendees must RSVP through PlanetBids™ by 03/11/2026 at 12:00 p.m to attend the Non-Mandatory Site Visit. </strong></p><p> </p><p>We are pleased to invite you to participate on <strong>Bid #C007043 THEME PARK SUBSTATION TRANSFORMER REPLACEMENT. </strong>The following link is to our new bidding platform, hosted by PlanetBids™, where you can find the bid documents: <a href="https://vendors.planetbids.com/portal/62171/bo/bo-detail/138926">BID LINK HERE</a> </p><p> </p><p>The Central Florida Tourism Oversight District (herein after “District”, “Owner” and “CFTOD”) is a Special Taxing District that serves as a local government entity. </p><p> </p><p>The objective of this project is the installation of a new transformer including low and high-side connections, installing the oil containment liner pit, and to provide testing and commissioning for the transformer.</p>
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.