Solicitation Spotlight: DLA Aviation RFQ for Wiring Harness (NSN 6150-01-145-3355)
Executive takeaway
DLA Aviation has an active RFQ for NSN 6150-01-145-3355 (WIRING HARNESS,BRAN) under an SBA set-aside. The notice calls for two lines with different delivery timelines and delivery to the Government of Israel. Quotes must be submitted electronically, and the turnaround is tight (response deadline shown as February 11, 2026).
What the buyer is trying to do
The buyer is seeking a supply of a specific wiring harness (identified by NSN 6150011453355) with defined quantities and delivery-by requirements. The procurement appears structured as a straightforward DLA Aviation supply action where schedule credibility and sourcing legitimacy (correct item to the NSN) will matter as much as price.
What work is implied
- Source or manufacture NSN 6150-01-145-3355 wiring harnesses in the required quantities.
- Plan for two separate delivery lines:
- Line 0001: Qty 211 (EA), delivery to the Government of Israel by 0110 days ADO.
- Line 0002: Qty 1 (EA), delivery to the Government of Israel by 0030 days ADO.
- Prepare and submit an electronic quote in accordance with the RFQ instructions (verify details in the solicitation/attachments).
Who should bid / who should pass
- Bid if:
- You are a small business aligned to NAICS 334419 and can reliably supply the exact NSN item.
- You can support the split delivery requirement, including an early delivery line (0030 days ADO).
- You have a compliant electronic quoting process and can turn around a clean RFQ response quickly.
- Pass if:
- You cannot validate that what you will ship matches the NSN requirements.
- You are unlikely to meet the accelerated delivery for the single-unit line.
- You rely on long-lead procurement without schedule certainty inside the ADO windows.
Response package checklist
- Completed quote for Solicitation SPE4A626T626Q (verify format/instructions in attachments).
- Pricing for each line item (0001 and 0002) with the stated quantities and unit of issue (EA).
- Confirmed delivery commitments matching the stated days ADO requirements.
- Confirmation that the quote is submitted electronically as required.
- Any required representations/certifications and product traceability documentation (verify in attachments).
Pricing & strategy notes
- Start with schedule realism: The 0030-days-ADO line suggests the buyer values near-term availability. If you can truly meet it, highlight how (inventory on hand, committed supply chain, etc.—only if accurate and supportable).
- Research comparable buys: Use historical awarded RFQs for the same NSN (and closely related wiring harness NSNs) to understand typical award patterns and lead times. Keep the comparison tied to the exact NSN whenever possible.
- Price the two lines intentionally: Because line 0002 is a single unit with faster delivery, it may carry a different cost structure than the 211-unit line. Ensure your quote reflects the operational reality of expediting (do not understate what you cannot execute).
- Do not assume specs are provided: The notice snippet does not include technical details beyond the NSN. Confirm what is required in the RFQ package before finalizing sourcing and cost.
Subcontracting / teaming ideas
- Partner with a wiring harness manufacturer or certified assembler to cover production capacity if you are primarily a distributor.
- Engage a logistics provider experienced with international delivery execution to reduce delivery risk to the stated destination (Government of Israel).
- If you can meet the 0030-days-ADO line from stock, consider a teaming arrangement where you cover the early line and a partner covers the larger quantity line (only if permitted by the RFQ—verify in attachments).
Risks & watch-outs
- Short response window: Posted February 6, 2026 with a response deadline shown as February 11, 2026—move fast on sourcing validation and quote preparation.
- Split delivery requirement: Two lines to the same destination but with different delivery-by timelines; ensure your plan addresses both without jeopardizing compliance.
- NSN match risk: The snippet does not include drawings/specs; verify what the RFQ requires so the item you quote is fully compliant.
- Electronic submission requirement: Quotes must be submitted electronically; confirm portal/email method and file format requirements in the solicitation.
- Set-aside compliance: The opportunity is marked SBA; ensure your eligibility and documentation are consistent with the RFQ terms.
Related opportunities
- 15--PANEL,STRUCTURAL,AI (SPE4A726Q0402)
- 58--TOWED BODY,SONAR (SPE4A726T8287)
- 53--NUT,PLAIN,EXTENDED (SPE4A625T27YX)
- 28--DISK AND HUB,TURBIN (SPE4A126T1311)
- NSN 6320-016057059, SALINITY SENSOR (Sources Sought)
How to act on this
- Open the notice and download/inspect the RFQ package: 61--WIRING HARNESS,BRAN (SPE4A626T626Q).
- Confirm you can supply the exact NSN and meet both ADO delivery requirements.
- Build line-by-line pricing and document your delivery commitments.
- Submit the quote electronically before the deadline shown in the notice.
If you want help deciding whether to bid, shaping a compliant RFQ response, or building a practical sourcing and schedule narrative, Federal Bid Partners LLC can support your pursuit from opportunity triage through submission.