Davis-Bacon
WV20260044 (Rev 1)
Coverage: West Virginia • Ohio.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 |
| BOILERMAKER | $47.13 | $28.93 |
| BRICKLAYER | $29.00 | $25.61 |
| BRICK POINTER/CAULKER/CLEANER | $29.00 | $25.61 |
| MASON - STONE | $29.00 | $25.61 |
| TILE SETTER | $31.65 | $25.56 |
| BRICKLAYER (BRICK REFRACTORY/BRICK PLACEMENT WORKER) | $32.64 | $23.95 |
| TILE FINISHER | $27.00 | $22.57 |
| CARPENTER (INCLUDING BATT INSULATION, DRYWALL HANGING, FORM WORK AND SCAFFOLD BUILDER) | $30.51 | $26.05 |
| MILLWRIGHT | $37.40 | $26.06 |
| ELECTRICIAN | $39.25 | $31.23 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 |
| LL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE, MECHANICS WITH TOOLS WITH 3/4 INCH DRIVE AND BELOW | $46.56 | $22.05 |
| IRONWORKER: ORNAMENTAL, REINFORCING, SHEETING AND STRUCTURAL | $35.19 | $25.66 |
| LABORER: GROUP 4 FLAGGER | $24.94 | $16.20 |
| LABORER: GROUP 3 PIPELAYER | $24.94 | $16.20 |
| LABORER: GROUP 2 CHAIN SAW, CONCRETE SAW (HAND HELD/WALK BEHIND), DEWATERING, CONCRETE WORKER, FENCE ERECTION, GROUTING, RODMAN | $24.94 | $16.20 |
| LABORER: GROUP 1 LANDSCAPE | $24.94 | $16.20 |
| MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, MOTORIZED BUGGY OPERATOR, PLASTER TENDER, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WATER BOY | $25.92 | $16.88 |
| PAINTER (DRYWALL FINISHING/TAPING; BRUSH, ROLLER AND SPRAY) | $29.47 | $18.72 |
| GLAZIER | $32.89 | $13.38 |
| PLASTERER (EIFS AND FIREPROOFING) | $30.50 | $22.22 |
| CEMENT MASON/CONCRETE FINISHER | $30.38 | $22.87 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $38.04 | $39.72 |
| PLUMBER | $38.04 | $39.72 |
| ROOFER | $34.00 | $19.11 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $34.92 | $29.70 |
| OPERATOR: ROLLER | $25.24 | $16.15 |
| OPERATOR: BACKHOE | $21.51 | $7.36 |
| LABORER: WACKER ROLLER OPERATOR | $23.07 | $11.07 |
| TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 |
| LABORER: POWER TOOL OPERATOR | $22.81 | $16.50 |
Related Wage Determinations
View directory →Davis-Bacon
WV20260110 (Rev 1)
West Virginia • Hampshire, Morgan
Davis-Bacon
WV20260013 (Rev 1)
West Virginia • Lewis
Davis-Bacon
WV20260025 (Rev 1)
West Virginia • Ritchie
Davis-Bacon
WV20260030 (Rev 1)
West Virginia • Upshur
Davis-Bacon
WV20260034 (Rev 1)
West Virginia • Berkeley
Davis-Bacon
WV20260035 (Rev 1)
West Virginia • Cabell