Davis-Bacon
WV20260010 (Rev 1)
Coverage: West Virginia • Hardy.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 |
| EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $30.21 | $10.43 |
| BOILERMAKER | $47.13 | $28.93 |
| BRICK POINTER/CAULKER/CLEANER | $31.65 | $25.56 |
| MASON - STONE | $33.00 | $26.18 |
| CARPENTER (INCLUDING DRYWALL HANGING AND SCAFFOLD BUILDER) | $29.40 | $20.25 |
| MILLWRIGHT | $37.40 | $26.06 |
| CARPENTER (FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL ONLY) | $30.00 | $21.15 |
| ELECTRICIAN | $42.20 | $20.39 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER | $34.71 | $22.05 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES | $45.21 | $22.05 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 |
| TOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE | $46.56 | $22.05 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 |
| IRONWORKER: REINFORCING | $36.10 | $24.65 |
| LABORER (WACKER ROLLER OPERATOR) | $28.02 | $16.80 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $22.76 | $16.75 |
| LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY | $25.41 | $16.75 |
| LABORER: GROUP 2 AIRTOOL OPERATOR, ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILING), BOBCAT OPERATOR (CLEAN UP/DEMOLITION), DEWATERING, RODMAN, SKYTRAK FORKLIFT OPERATOR | $24.13 | $16.05 |
| LABORER GROUP 1 COMMON OR GENERAL | $24.13 | $16.05 |
| PAINTER: DRYWALL FINISHING/TAPING | $30.57 | $20.06 |
| GLAZIER | $32.89 | $13.38 |
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $28.52 | $3.00 |
| ROOFER | $24.28 | $9.32 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $27.64 | $18.09 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $22.03 | $9.95 |
| OPERATOR: FORKLIFT | $33.09 | $3.00 |
| OPERATOR: EXCAVATOR | $30.31 | $10.81 |
| OPERATOR: BULLDOZER | $30.24 | $10.26 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.05 | $8.54 |
| LABORER: MASON TENDER - BRICK | $21.47 | $8.29 |
| LABORER: DEMOLITION | $20.58 | $9.47 |
| IRONWORKER, STRUCTURAL | $26.01 | $12.18 |
| BRICKLAYER | $27.50 | $12.35 |
| CARPENTER (FORM WORK ONLY) | $29.81 | $23.45 |
| LABORER (TAMPER - HAND HELD) | $25.79 | $16.19 |
| LABORER (SCAFFOLD BUILDER) | $24.04 | $16.35 |
| LABORER (PIPELAYER) | $24.34 | $16.41 |
| LABORER (MORTAR MIXER) | $24.35 | $16.20 |
| LABORER (LANDSCAPE) | $23.63 | $16.43 |
| LABORER (GRADE CHECKER) | $24.24 | $16.27 |
| LABORER (CONCRETE WORKER) | $24.29 | $16.27 |
| LABORER (CHIPPING GUN) | $24.78 | $16.25 |
| LABORER (CARPENTER TENDER) | $24.19 | $16.23 |
| PLUMBER | $36.58 | $24.58 |
Related Wage Determinations
View directory →Davis-Bacon
WV20260110 (Rev 1)
West Virginia • Hampshire, Morgan
Davis-Bacon
WV20260013 (Rev 1)
West Virginia • Lewis
Davis-Bacon
WV20260025 (Rev 1)
West Virginia • Ritchie
Davis-Bacon
WV20260030 (Rev 1)
West Virginia • Upshur
Davis-Bacon
WV20260034 (Rev 1)
West Virginia • Berkeley
Davis-Bacon
WV20260035 (Rev 1)
West Virginia • Cabell