Davis-Bacon
WI20260038 (Rev 1)
Coverage: Wisconsin • Ozaukee, Washington.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER | $45.46 | $31.52 |
| ELECTRICIAN | $33.00 | $14.97 |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR (UNDER 130,000 LBS.), BULLDOZER; ROLLER) | $44.92 | $27.35 |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR (130,000 LBS. AND OVER)) | $45.67 | $27.35 |
| LABORER: MASON TENDER - BRICK | $21.65 | $18.73 |
| PLUMBER | $60.05 | $27.90 |
| ROOFER | $41.50 | $25.54 |
| SHEET METAL WORKER, INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION ((2) FOUR STORIES) | $37.14 | $29.98 |
| SHEET METAL WORKER, INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION ((1) THREE STORIES & UNDER) | $37.14 | $29.98 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION) | $24.83 | $0.00 |
| OPERATOR: LOADER | $25.70 | $9.58 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 |
| LABORER: COMMON OR GENERAL | $18.64 | $9.33 |
| CEMENT MASON/CONCRETE FINISHER | $23.64 | $6.42 |
Related Wage Determinations
View directory →Davis-Bacon
WI20260025 (Rev 2)
Wisconsin • Chippewa
Davis-Bacon
WI20260008 (Rev 1)
Wisconsin • Adams, Ashland, Barron +69
Davis-Bacon
WI20260013 (Rev 1)
Wisconsin • Pierce, St Croix
Davis-Bacon
WI20260011 (Rev 1)
Wisconsin • Adams, Ashland, Barron +49
Davis-Bacon
WI20260001 (Rev 1)
Wisconsin • Milwaukee, Ozaukee, Washington +1
Davis-Bacon
WI20260030 (Rev 2)
Wisconsin • Sheboygan