Davis-Bacon
WI20260030 (Rev 2)
Coverage: Wisconsin • Sheboygan.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER | $30.21 | $22.26 |
| ELECTRICIAN | $33.00 | $14.97 |
| OPERATOR: POWER EQUIPMENT (BULLDOZER UNDER 40 H.P.; ROLLER 5 TONS AND UNDER; RUBBER TIRE ROLLER) | $44.62 | $27.35 |
| OPERATOR: POWER EQUIPMENT (BULLDOZER OVER 40 H.P.; ROLLER OVER 5 TONS) | $45.67 | $27.35 |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR UNDER 130,000 LBS.) | $44.92 | $27.35 |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR 130,000 LBS. AND OVER) | $45.67 | $27.35 |
| LABORER: COMMON OR GENERAL; MASON TENDER - BRICK | $23.90 | $16.48 |
| PLUMBER | $50.02 | $23.29 |
| ROOFER | $33.73 | $16.34 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $27.92 | $21.43 |
| OPERATOR: LOADER | $25.70 | $9.58 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 |
| CEMENT MASON/CONCRETE FINISHER | $24.37 | $7.29 |
Related Wage Determinations
View directory →Davis-Bacon
WI20260025 (Rev 2)
Wisconsin • Chippewa
Davis-Bacon
WI20260008 (Rev 1)
Wisconsin • Adams, Ashland, Barron +69
Davis-Bacon
WI20260013 (Rev 1)
Wisconsin • Pierce, St Croix
Davis-Bacon
WI20260011 (Rev 1)
Wisconsin • Adams, Ashland, Barron +49
Davis-Bacon
WI20260001 (Rev 1)
Wisconsin • Milwaukee, Ozaukee, Washington +1
Davis-Bacon
WI20260031 (Rev 1)
Wisconsin • Waukesha