Davis-Bacon
WA20260122 (Rev 1)
Coverage: Washington • Chelan.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER | $44.21 | $17.28 |
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 |
| TREE TRIMMER | $42.57 | $17.97 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $55.19 | $20.94 |
| LINE CONSTRUCTION: (GROUND PERSON) | $37.53 | $17.74 |
| ELECTRICIAN | $53.20 | $29.15 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE: OVER 30 METRIC TONS AND UP TO 50 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE: 15 TO 30 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 |
| OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (WEST OF THE 120TH MERIDIAN) | $61.56 | $27.57 |
| OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL OPERATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 |
| OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL LOCATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 |
| OPERATOR: DRILL: DRILLING MACHINE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 |
| OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 |
| OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 |
| OPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 |
| OPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 |
| OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 |
| OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 |
| OPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 |
| IRONWORKER | $57.94 | $34.52 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $53.99 | $17.05 |
| TRAFFIC CONTROL: FLAGGER | $34.03 | $16.90 |
| PAINTER | $41.24 | $14.70 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 |
| TRUCK DRIVER: DUMP TRUCK | $26.27 | $8.56 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 |
| OPERATOR: ROLLER | $45.11 | $11.08 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.35 | $13.44 |
| OPERATOR: MECHANIC | $34.39 | $14.95 |
| OPERATOR: LOADER | $37.92 | $12.05 |
| OPERATOR: GRADER/BLADE | $40.28 | $16.17 |
| OPERATOR: FORKLIFT | $45.93 | $19.20 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.60 | $0.00 |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 |
| LABORER: PIPELAYER | $40.85 | $10.89 |
| LABORER: HOD CARRIER | $35.06 | $10.94 |
| LABORER: CONCRETE SAW CHAIN | $36.24 | $10.89 |
| LABORER: COMMON OR GENERAL | $27.99 | $3.04 |
| GRADE CHECKER | $34.79 | $13.87 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 |
Related Wage Determinations
View directory →Davis-Bacon
WA20260027 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260021 (Rev 2)
Washington • Adams
Davis-Bacon
WA20260038 (Rev 1)
Washington • San Juan
Davis-Bacon
WA20260040 (Rev 1)
Washington • Wahkiakum
Davis-Bacon
WA20260045 (Rev 2)
Washington • Grant
Davis-Bacon
WA20260046 (Rev 1)
Washington • Grays Harbor