Davis-Bacon
WA20260042 (Rev 2)
Coverage: Washington • Whitman.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BRICKLAYER | $33.95 | $19.33 |
| TILE SETTER | $29.86 | $13.95 |
| ELECTRICIAN | $49.55 | $19.09 |
| POWER EQUIPMENT OPERATOR: GROUP 8 LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) | $42.36 | $23.40 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER) LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) | $40.39 | $23.40 |
| ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC | $40.05 | $23.40 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.) | $39.71 | $23.40 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) | $39.51 | $23.40 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) | $39.31 | $23.40 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT | $38.56 | $23.40 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $43.40 | $32.77 |
| LABORER, MASON TENDER BRICK | $38.05 | $16.75 |
| LABORER: A-1: GROUP 10 GRADE CHECKER | $40.21 | $16.90 |
| LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER | $37.46 | $16.90 |
| DRYWALL FINISHER/TAPER | $37.46 | $18.42 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $33.95 | $15.65 |
| FLOOR LAYER: CARPET AND VINYL | $42.01 | $20.20 |
| BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 |
| PIPEFITTER | $47.15 | $27.20 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $35.75 | $14.40 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $44.30 | $28.58 |
| SHEETMETAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $45.83 | $27.92 |
| TRUCK DRIVER | $23.50 | $6.87 |
| PLUMBER | $35.00 | $0.00 |
| PIPE INSULATOR/WRAPPER | $24.21 | $4.07 |
| OPERATOR: CRANE | $25.53 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 |
| LABORER: COMMON OR GENERAL | $17.27 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
WA20260027 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260038 (Rev 1)
Washington • San Juan
Davis-Bacon
WA20260040 (Rev 1)
Washington • Wahkiakum
Davis-Bacon
WA20260045 (Rev 2)
Washington • Grant
Davis-Bacon
WA20260046 (Rev 1)
Washington • Grays Harbor
Davis-Bacon
WA20260049 (Rev 1)
Washington • Kittitas