Skip to content
Davis-Bacon

UT20260020 (Rev 1)

Coverage: Utah • Millard.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR$30.78$16.09
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$22.03$11.88
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$35.68$17.57
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY$21.65$8.65
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65
LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.59$8.65
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65
TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$12.00$0.00
OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$13.63$0.00
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION)$10.89$0.00
OPERATOR: LOADER (FRONT END)$11.38$0.00
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION$13.61$0.00
LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$9.00$0.00
LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$10.92$0.00
LABORER: MASON TENDER - CEMENT/CONCRETE$9.00$0.36
CEMENT MASON/CONCRETE FINISHER$14.00$0.56
CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK)$14.75$3.03
TO THE ABOVE RATE$46.02$15.75
TO THE ABOVE RATE$46.65$15.75
TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGER TRUCK$41.90$15.75

Related Wage Determinations

View directory →