Davis-Bacon

UT20260011 (Rev 1)

Coverage: Utah • Summit.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
LINE CONSTRUCTION: LINEMAN$58.83$21.21
OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER(UNDER 2 CU. YDS.), OILER$36.55$18.62
OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BULLDOZER, FRONT END LOADER(2 TO 5 CU. YDS.), GRADE SETTER, OIL DISTRIBUTOR, SCRAPER$37.79$18.62
OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER(OVER 5 CU.YDS.)$39.01$18.62
OPERATOR: POWER EQUIPMENT: (1)MECHANIC-EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION$41.71$18.62
OPERATOR: POWER EQUIPMENT (6) SCREED$36.55$18.62
OPERATOR: POWER EQUIPMENT ((7) ROLLER(DIRT AND GRADE COMPACTION))$34.25$18.62
OPERATOR: POWER EQUIPMENT ((2A)BLADE/GRADER)$40.32$18.62
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, MECHANIC: NATURAL GAS PIPELINE CONSTRUCTION ONLY$35.68$17.57
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$22.03$11.88
IRONWORKER$32.68$27.55
LABORER: POT TENDER AND SAND BLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65
LABORER: COMMON OR GENERAL, PIPELAYER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.59$8.65
LABORER: (5)HAND HELD DRILL$21.65$8.65
LABORER: (3) MASON TENDER (CEMENT/CONCRETE), HAND HELD SAW, JACKHAMMER, POWER SAW)$20.85$8.65
LABORER: (1)FLAGGER$20.59$8.65
LABORER: (1) COMMON OR GENERAL: EXCLUDING NATURAL GAS PIPELINE & WATER/SEWER LINE CONSTRUCTION$20.59$8.65
WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE$15.57$0.00
WATER & SEWER LINES: LABORER, COMMON OR GENERAL$12.81$0.00
TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$14.40$3.99
OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE AND WATER/SEWER LINE CONSTRUCTION)$19.98$0.00
OPERATOR: CRANE$28.97$9.40
LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$14.00$0.00
LABORER: LANDSCAPE$7.25$0.00
ELECTRICIAN$23.74$7.64
CEMENT MASON/CONCRETE FINISHER$17.08$3.14
CARPENTER, INCLUDES FORM WORK$14.63$0.97
TRUCK DRIVER ZONE 2: GROUP 3$41.90$15.75
TRUCK DRIVER ZONE 2: GROUP 2$46.02$15.75
TRUCK DRIVER ZONE 2: GROUP 1$46.65$15.75
TRUCK DRIVER ZONE 1: GROUP 3$40.37$15.10
TRUCK DRIVER ZONE 1: GROUP 2$40.75$15.10
TRUCK DRIVER ZONE 1: GROUP 1$41.39$15.10