Davis-Bacon
UT20260011 (Rev 1)
Coverage: Utah • Summit.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| LINE CONSTRUCTION: LINEMAN | $58.83 | $21.21 |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER(UNDER 2 CU. YDS.), OILER | $36.55 | $18.62 |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BULLDOZER, FRONT END LOADER(2 TO 5 CU. YDS.), GRADE SETTER, OIL DISTRIBUTOR, SCRAPER | $37.79 | $18.62 |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER(OVER 5 CU.YDS.) | $39.01 | $18.62 |
| OPERATOR: POWER EQUIPMENT: (1)MECHANIC-EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION | $41.71 | $18.62 |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $36.55 | $18.62 |
| OPERATOR: POWER EQUIPMENT ((7) ROLLER(DIRT AND GRADE COMPACTION)) | $34.25 | $18.62 |
| OPERATOR: POWER EQUIPMENT ((2A)BLADE/GRADER) | $40.32 | $18.62 |
| OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, MECHANIC: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 |
| IRONWORKER | $32.68 | $27.55 |
| LABORER: POT TENDER AND SAND BLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 |
| LABORER: COMMON OR GENERAL, PIPELAYER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 |
| LABORER: (5)HAND HELD DRILL | $21.65 | $8.65 |
| LABORER: (3) MASON TENDER (CEMENT/CONCRETE), HAND HELD SAW, JACKHAMMER, POWER SAW) | $20.85 | $8.65 |
| LABORER: (1)FLAGGER | $20.59 | $8.65 |
| LABORER: (1) COMMON OR GENERAL: EXCLUDING NATURAL GAS PIPELINE & WATER/SEWER LINE CONSTRUCTION | $20.59 | $8.65 |
| WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE | $15.57 | $0.00 |
| WATER & SEWER LINES: LABORER, COMMON OR GENERAL | $12.81 | $0.00 |
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $14.40 | $3.99 |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE AND WATER/SEWER LINE CONSTRUCTION) | $19.98 | $0.00 |
| OPERATOR: CRANE | $28.97 | $9.40 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $14.00 | $0.00 |
| LABORER: LANDSCAPE | $7.25 | $0.00 |
| ELECTRICIAN | $23.74 | $7.64 |
| CEMENT MASON/CONCRETE FINISHER | $17.08 | $3.14 |
| CARPENTER, INCLUDES FORM WORK | $14.63 | $0.97 |
| TRUCK DRIVER ZONE 2: GROUP 3 | $41.90 | $15.75 |
| TRUCK DRIVER ZONE 2: GROUP 2 | $46.02 | $15.75 |
| TRUCK DRIVER ZONE 2: GROUP 1 | $46.65 | $15.75 |
| TRUCK DRIVER ZONE 1: GROUP 3 | $40.37 | $15.10 |
| TRUCK DRIVER ZONE 1: GROUP 2 | $40.75 | $15.10 |
| TRUCK DRIVER ZONE 1: GROUP 1 | $41.39 | $15.10 |