Davis-Bacon
TX20260261 (Rev 1)
Coverage: Texas • Midland.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $33.17 | $24.92 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | $32.35 | $13.10 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | $32.85 | $13.10 |
| IRONWORKER: ORNAMENTAL | $28.26 | $8.13 |
| PLUMBER | $28.64 | $10.65 |
| TRUCK DRIVER: WATER TRUCK | $12.00 | $4.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 |
| TRUCK DRIVER: DUMP TRUCK | $12.39 | $1.18 |
| TILE SETTER | $14.74 | $0.00 |
| TILE FINISHER | $11.22 | $0.00 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $22.73 | $7.52 |
| ROOFER | $14.75 | $0.00 |
| PIPEFITTER | $25.80 | $8.55 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $15.00 | $0.73 |
| OPERATOR: ROLLER | $12.70 | $0.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 |
| OPERATOR: MECHANIC | $17.52 | $3.33 |
| OPERATOR: LOADER | $13.55 | $0.94 |
| OPERATOR: GRADER/BLADE | $13.37 | $0.00 |
| OPERATOR: FORKLIFT | $14.83 | $0.00 |
| OPERATOR: DRILL | $16.22 | $0.34 |
| OPERATOR: BULLDOZER | $18.29 | $1.31 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.25 | $0.00 |
| LABORER: ROOF TEAROFF | $11.28 | $0.00 |
| LABORER: PIPELAYER | $12.49 | $2.13 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.58 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.38 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.80 | $0.00 |
| IRONWORKER, STRUCTURAL | $22.16 | $5.26 |
| IRONWORKER, REINFORCING | $12.27 | $0.00 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $19.77 | $7.13 |
| ELECTRICIAN | $23.18 | $6.31 |
| CEMENT MASON/CONCRETE FINISHER | $13.76 | $0.00 |
| CARPENTER | $13.82 | $0.00 |
| BRICKLAYER | $20.00 | $0.00 |