Davis-Bacon
TN20260133 (Rev 1)
Coverage: Tennessee • Polk.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $35.35 | $14.63 |
| OPERATING ENGINEERS: (FORKLIFT) | $30.44 | $13.40 |
| OPERATING ENGINEERS: (BULLDOZER AND CRANE) | $33.23 | $13.40 |
| LABORER: COMMON OR GENERAL | $15.36 | $5.97 |
| TRUCK DRIVER: DUMP TRUCK | $10.76 | $0.00 |
| OPERATOR: LOADER | $13.50 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.82 | $0.00 |
| LABORER: PIPELAYER | $11.68 | $0.00 |
| LABORER: FLAGGER | $8.73 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
TN20260138 (Rev 2)
Tennessee • Tipton
Davis-Bacon
TN20260194 (Rev 1)
Tennessee • Bradley, Polk
Davis-Bacon
TN20260196 (Rev 1)
Tennessee • Cannon, Cheatham
Davis-Bacon
TN20260193 (Rev 1)
Tennessee • Wilson
Davis-Bacon
TN20260198 (Rev 1)
Tennessee • Chester, Crockett
Davis-Bacon
TN20260013 (Rev 1)
Tennessee • Franklin, Humphreys, Maury +2