| Occupation | Base | Fringe |
|---|---|---|
| Fringes TRUCK DRIVER: Group 2 Group 1: Tandem Truck without trailer or pup; Single Axle Truck over 26,000 GVW with or without Trailer Group 2: Semi-Tractor and Trailer; Tandem Truck with Pup or Trailer | $32.07 | $8.42 |
| TRUCK DRIVER: Group 1 Group 1: Tandem Truck without trailer or pup; Single Axle Truck over 26,000 GVW with or without Trailer Group 2: Semi-Tractor and Trailer; Tandem Truck with Pup or Trailer | $30.01 | $0.00 |
| for traffic marking purposes. Group 2: Painting or protective coating bridges, apply varnish, antirust materials, prepare steel or other surfaces with primer or sandblasting, paints structural framewor | $29.81 | $0.00 |
| for traffic marking purposes. Group 2: Painting or protective coating bridges, apply varnish, antirust materials, prepare steel or other surfaces with primer or sandblasting, paints structural framewor | $26.96 | $0.00 |
| e Layer (except culvert); Form Builder Tender. Group 3: Asphalt Plant Tender; Pile Driver Leadsman; Form Setter, Oiler/Greaser. Group 5: Carpenter; Form Builder Group 6: Concrete Finsher; Grade Checker | $29.81 | $0.00 |
| e Layer (except culvert); Form Builder Tender. Group 3: Asphalt Plant Tender; Pile Driver Leadsman; Form Setter, Oiler/Greaser. Group 5: Carpenter; Form Builder Group 6: Concrete Finsher; Grade Checker | $31.94 | $0.00 |
| e Layer (except culvert); Form Builder Tender. Group 3: Asphalt Plant Tender; Pile Driver Leadsman; Form Setter, Oiler/Greaser. Group 5: Carpenter; Form Builder Group 6: Concrete Finsher; Grade Checker | $28.97 | $0.00 |
| e Layer (except culvert); Form Builder Tender. Group 3: Asphalt Plant Tender; Pile Driver Leadsman; Form Setter, Oiler/Greaser. Group 5: Carpenter; Form Builder Group 6: Concrete Finsher; Grade Checker | $26.96 | $0.00 |
| e Layer (except culvert); Form Builder Tender. Group 3: Asphalt Plant Tender; Pile Driver Leadsman; Form Setter, Oiler/Greaser. Group 5: Carpenter; Form Builder Group 6: Concrete Finsher; Grade Checker | $26.93 | $0.00 |
| and join steel girders, columns, structural framework, air wrenches, spud bars, grinders, drills, sledgehammers, tag lines, plumb bobs, lasers, levels, bolts, wire, welds, shears, rod-bending machines | $28.97 | $0.00 |
| and join steel girders, columns, structural framework, air wrenches, spud bars, grinders, drills, sledgehammers, tag lines, plumb bobs, lasers, levels, bolts, wire, welds, shears, rod-bending machines | $26.93 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
SD20260021 (Rev 2)
South Dakota • Beadle, Clark, Day +13
Davis-Bacon
SD20260031 (Rev 2)
South Dakota • McCook, Turner
Davis-Bacon
SD20260026 (Rev 2)
South Dakota • Lincoln
Davis-Bacon
SD20260014 (Rev 1)
South Dakota • Harding
Davis-Bacon
SD20260019 (Rev 1)
South Dakota • Walworth
Davis-Bacon
SD20260012 (Rev 1)
South Dakota • Dewey