Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$60.84$48.38
BOILERMAKER$55.00$35.48
BRICKLAYER$48.70$31.61
TILE SETTER$51.36$30.02
MASON - STONE$48.40$31.95
POINTER, CAULKER AND CLEANER$50.00$30.70
CARPENTER/LATHER$55.82$30.09
MILLWRIGHT$54.54$38.78
FLOOR LAYER: CARPET$56.51$32.39
PILEDRIVERMAN$48.25$44.92
ELECTRICIAN$70.97$46.13
ELECTRICIAN (SOUND AND COMMUNICATION TECHNICIAN) (INSTALLATION OF VOICE DATA, IT NETWORK, WIFI))$63.97$30.40
DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY$71.85$38.44
ERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$47.17$32.33
ERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$48.16$32.62
ERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$49.88$33.13
ERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$50.18$33.22
ERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$57.29$35.29
ERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$54.27$34.42
ERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$57.52$35.38
ERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$54.52$34.49
IRONWORKER: STRUCTURAL AND ORNAMENTAL$56.50$45.30
RS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY$50.39$36.05
RS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY$46.86$36.05
LABORER GROUP 11 MASON TENDER$39.50$26.69
LABORER GROUP 10 WELDERS AND BURNERS$40.93$26.69
OLITION EXCEPT BURNERS; LAYING CONDUITS AND DUCTS; SHEATHING; LAGGING; LAYING NON-METALLIC PIPE AND CAULKING; ALL OTHER TYPES OF LABORERS; POURING CONCRETE; OPERATING VIBRATOR; FREE AIR TUNNELS: MINERS$39.10$26.69
LABORER GROUP 9 MINERS BORE DRIVER; BLASTERS; DRILLERS; PNEUMATIC SHIELD OPERATORS$40.68$26.69
LABORER GROUP 8 FORM SETTERS$40.53$26.69
LABORER GROUP 6 YARD WORKERS$39.24$26.69
LABORER GROUP 5 CAISSON BOTTOM MAN$39.45$26.69
LABORER GROUP 4 POWDERMEN; WAGON DRILL OPERATOR (MULTIPLE); CIRCULAR CAISSON EXCAVATION; UNDERPINNING EXCAVATION$39.40$26.69
LABORER GROUP 3 WAGON DRILL OPERATOR (SINGLE)$39.25$26.69
LABORER GROUP 2 POWER BUGGIES; BURNERS ON DEMOLITION$39.20$26.69
LABORER (ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE REMOVAL, LEAD BASED PAINT REMOVAL)$41.00$27.04
LANDSCAPE LABORER FARM TRACTOR DRIVER, HYDROSEEDER NOZZLEMAN AND MULCHER NOZZLEMAN: FOOTNOTE: A. PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY$31.73$23.72
TILE FINISHER$25.10$20.75
TERRAZZO FINISHER$27.03$20.58
MARBLE FINISHER$25.10$20.75
TERRAZZO WORKER/SETTER$48.01$28.67
MARBLE SETTER$44.90$30.75
PAINTERS: (SPRAY, STEEL AND SWING)$42.49$28.10
PAINTERS: (BRUSH, ROLLER)$41.24$28.10
DRYWALL FINISHER/TAPER$42.25$32.16
WINDOW TINTER$25.02$13.06
GLAZIER$46.09$34.83
CEMENT MASON/CONCRETE FINISHER$48.70$32.26
PLASTERER$45.08$33.59
STEAMFITTER$72.52$44.58
PLUMBER$70.53$38.81
ROOFERS: SLATE AND TILE$34.25$21.75
ROOFERS: SHINGLES FOOTNOTE (COMPOSITION ROOFER ONLY): A. PAID HOLIDAY: ELECTION DAY$31.25$21.75
ROOFERS: COMPOSITION FOOTNOTE (COMPOSITION ROOFER ONLY): A. PAID HOLIDAY: ELECTION DAY$41.48$33.37
SPRINKLER FITTER$66.22$34.25
SHEET METAL WORKER$62.62$50.66
SHEET METAL WORKER (SIGN MAKERS & HANGERS)$33.89$24.25
ATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY$37.92$23.32
ION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY$37.67$23.32
ATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY$37.57$23.32
ATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY$37.67$23.32