Davis-Bacon
OK20260046 (Rev 2)
Coverage: Oklahoma • Lincoln.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BRICKLAYER | $26.92 | $13.09 |
| MILLWRIGHT | $29.15 | $11.81 |
| CARPENTER (FORM WORK ONLY) | $27.79 | $10.05 |
| ELECTRICIAN | $41.40 | $13.14 |
| ELECTRICIAN (LOW VOLTAGE WIRING AND ALARM INSTALLATION ONLY) | $24.26 | $9.76 |
| FOR LESS THAN 5 YEARS' SERVICE | $51.11 | $38.44 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 |
| QUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | $27.25 | $19.05 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $32.10 | $17.38 |
| PLUMBER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $41.00 | $16.03 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION, EXCLUDING HVAC UNIT INSTALLATION) | $41.00 | $16.03 |
| ROOFER | $26.30 | $10.34 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $39.05 | $25.77 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $33.38 | $16.36 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.60 | $0.00 |
| PLASTERER | $17.50 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.17 | $0.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $13.38 | $1.54 |
| OPERATOR: LOADER (FRONT END) | $16.18 | $0.00 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.25 | $4.35 |
| LABORER: PLASTER TENDER | $12.00 | $0.00 |
| LABORER: PIPELAYER | $12.39 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 |
| LABORER: MASON TENDER - BRICK | $12.00 | $0.00 |
| LABORER: LANDSCAPE | $13.75 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.20 | $0.00 |
| IRONWORKER, REINFORCING | $17.11 | $0.00 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $21.64 | $6.46 |
| GLAZIER | $12.02 | $2.42 |
| FENCE ERECTOR | $16.00 | $0.00 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $14.08 | $0.00 |
| DRYWALL FINISHER/TAPER | $14.25 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.72 | $0.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.31 | $2.96 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $14.45 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
OK20260034 (Rev 1)
Oklahoma • Alfalfa, Beaver, Blaine +12
Davis-Bacon
OK20260023 (Rev 1)
Oklahoma • Comanche
Davis-Bacon
OK20260024 (Rev 1)
Oklahoma • Le Flore
Davis-Bacon
OK20260026 (Rev 1)
Oklahoma • Oklahoma
Davis-Bacon
OK20260032 (Rev 1)
Oklahoma • Texas
Davis-Bacon
OK20260044 (Rev 1)
Oklahoma • Creek