Skip to content
Davis-Bacon

NY20260114 (Rev 1)

Coverage: New York • Schuyler.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
TILE SETTER$38.34$20.51
CEMENT MASON/CONCRETE FINISHER$32.53$22.10
SOFT FLOOR LAYER$25.61$17.40
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING)$42.50$27.23
IRONWORKER: ORNAMENTAL$35.49$32.30
IRONWORKER, STRUCTURAL$35.49$32.30
IRONWORKER, REINFORCING$35.49$32.30
PAINTER (SPRAY)$28.35$25.21
PAINTER: BRUSH AND ROLLER$27.25$25.24
PLUMBER$42.20$29.80
PIPEFITTER (INCLUDES HVAC UNIT INSTALLATION)$37.47$27.40
ROOFER$36.70$18.00
PAINTER: DRYWALL FINISHING/TAPING$24.81$21.13
OPERATOR: FORKLIFT$32.70$24.12
OPERATOR: CRANE$36.52$26.91
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$41.10$19.26
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.97$24.17
MILLWRIGHT$27.08$19.72
LABORER: MASON TENDER - CEMENT/CONCRETE$23.84$14.18
LABORER: COMMON OR GENERAL$24.35$16.27
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$31.50$21.11
INSTALLER: METAL STUDS$26.70$17.40
GLAZIER$25.03$19.70
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION$27.05$17.40
CARPENTER (FORM WORK ONLY)$25.84$17.56
CARPENTER (DRYWALL HANGING ONLY)$26.99$17.40
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$26.00$18.35
BRICKLAYER$31.61$24.98

Related Wage Determinations

View directory →