Davis-Bacon
NY20260102 (Rev 1)
Coverage: New York • Chautauqua.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| TILE SETTER | $38.34 | $20.51 |
| BRICKLAYER | $37.88 | $24.10 |
| CEMENT MASON/CONCRETE FINISHER | $32.53 | $22.10 |
| SOFT FLOOR LAYER | $25.61 | $17.40 |
| CARPENTER (INCLUDES DRYWALL HANGING AND FORM WORK (EXCLUDES ACOUSTICAL CEILING INSTALLATION AND METAL STUD INSTALLATION)) | $30.65 | $21.52 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $42.50 | $27.23 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.23 | $35.40 |
| IRONWORKER: ORNAMENTAL | $35.49 | $32.30 |
| IRONWORKER, STRUCTURAL | $35.49 | $32.30 |
| IRONWORKER, REINFORCING | $35.49 | $32.30 |
| LABORER (COMMON OR GENERAL) | $27.68 | $22.14 |
| PAINTER (SPRAY) | $28.35 | $25.21 |
| PAINTER: BRUSH AND ROLLER | $27.25 | $25.24 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $42.20 | $29.80 |
| PLUMBER | $42.20 | $29.80 |
| ROOFER | $36.70 | $18.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $24.81 | $21.13 |
| OPERATOR: FORKLIFT | $32.70 | $24.12 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.10 | $19.26 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.97 | $24.17 |
| MILLWRIGHT | $27.08 | $19.72 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.84 | $14.18 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $31.50 | $21.11 |
| INSTALLER: METAL STUDS | $26.70 | $17.40 |
| GLAZIER | $25.03 | $19.70 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $26.00 | $18.35 |