Davis-Bacon
NV20260043 (Rev 2)
Coverage: Nevada • Storey.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $29.40 | $11.16 |
| POWER EQUIPMENT OPERATOR ((8) PAVER (ASPHALT, AGGREGATE, AND CONCRETE)) | $63.90 | $36.40 |
| POWER EQUIPMENT OPERATOR ((6) LOADER) | $63.79 | $36.40 |
| LABORER ((4) PIPELAYER) | $34.45 | $16.30 |
| LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $34.20 | $16.30 |
| LABORER ((1) COMMON OR GENERAL) | $33.95 | $16.30 |
| PAINTER: BRUSH AND ROLLER | $39.43 | $15.71 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $47.51 | $29.38 |
| ROOFER | $18.50 | $0.00 |
| PLUMBER | $26.16 | $0.00 |
| PAINTER: SPRAY | $20.50 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.11 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.16 | $0.00 |
| IRONWORKER, REINFORCING | $19.78 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.00 | $0.00 |
| CARPENTER | $17.82 | $0.00 |