Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| NGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT | $51.74 | $46.20 |
| PER HOUR ADDITIONAL | $49.60 | $37.96 |
| CEMENT MASON | $49.60 | $37.96 |
| MARBLE SETTER | $64.66 | $40.97 |
| TILE SETTER | $64.90 | $37.28 |
| ADDITIONAL PER DAY | $50.05 | $33.90 |
| PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER | $57.42 | $34.17 |
| CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION | $57.42 | $34.17 |
| SOFT FLOOR LAYER | $57.42 | $34.17 |
| PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER | $58.84 | $35.06 |
| TIMES THE JOURNEYMAN RATE | $65.43 | $42.86 |
| TIMES THE JOURNEYMAN RATE | $69.72 | $44.27 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $52.88 | $37.50 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 |
| IRONWORKER: REINFORCING | $49.94 | $50.32 |
| CONTAMINATION OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; AND, IN ADDITION, ALL WORK TASKS INVOLVED IN THE MAINTENANCE AND OPERATION OF ENERGY RESOURCE RECOVERY PLANTS (CO-GENERATION PLANTS) | $28.37 | $21.62 |
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 |
| LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 |
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 |
| PAINTER: BRUSH AND ROLLER | $45.55 | $29.86 |
| PAINTER: SPRAY | $45.55 | $29.86 |
| PER HOUR ADDITIONAL | $52.68 | $31.29 |
| PLASTERER | $54.64 | $30.95 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION | $62.09 | $45.05 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $57.97 | $40.22 |
| ROOFER: INCLUDES ALL TYPES OF ROOFS | $45.40 | $29.14 |
| SPRINKLER FITTER: FIRE SPRINKLERS | $67.97 | $39.35 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION | $51.30 | $51.55 |
| LABORER: PIPELAYER | $38.85 | $0.14 |
| ELEVATOR MECHANIC | $40.21 | $11.22 |
| ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $47.36 | $44.02 |
| ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $47.51 | $44.02 |