NJ20260040 (Rev 1)

Coverage: New Jersey • Passaic.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
NGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT$51.74$46.20
PER HOUR ADDITIONAL$49.60$37.96
CEMENT MASON$49.60$37.96
MARBLE SETTER$64.66$40.97
TILE SETTER$64.90$37.28
ADDITIONAL PER DAY$50.05$33.90
PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.42$34.17
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.42$34.17
SOFT FLOOR LAYER$57.42$34.17
PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$58.84$35.06
TIMES THE JOURNEYMAN RATE$65.43$42.86
TIMES THE JOURNEYMAN RATE$69.72$44.27
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$52.88$37.50
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$56.59$37.50
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$58.22$37.50
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$60.13$37.50
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$61.72$37.50
IRONWORKER: STRUCTURAL AND ORNAMENTAL$52.24$50.32
IRONWORKER: REINFORCING$49.94$50.32
CONTAMINATION OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; AND, IN ADDITION, ALL WORK TASKS INVOLVED IN THE MAINTENANCE AND OPERATION OF ENERGY RESOURCE RECOVERY PLANTS (CO-GENERATION PLANTS)$28.37$21.62
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE$36.50$30.22
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN$35.75$30.22
DRYWALL FINISHER/TAPER$44.87$30.15
PAINTER: BRUSH AND ROLLER$45.55$29.86
PAINTER: SPRAY$45.55$29.86
PER HOUR ADDITIONAL$52.68$31.29
PLASTERER$54.64$30.95
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION$62.09$45.05
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$57.97$40.22
ROOFER: INCLUDES ALL TYPES OF ROOFS$45.40$29.14
SPRINKLER FITTER: FIRE SPRINKLERS$67.97$39.35
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION$51.30$51.55
LABORER: PIPELAYER$38.85$0.14
ELEVATOR MECHANIC$40.21$11.22
ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS$47.36$44.02
ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS$47.51$44.02