Davis-Bacon
NJ20260031 (Rev 1)
Coverage: New Jersey • Essex.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| gs and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement) | $51.74 | $46.20 |
| per hour additional | $49.60 | $37.96 |
| CEMENT MASON | $49.60 | $37.96 |
| TILE SETTER | $64.90 | $37.28 |
| per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION) | $57.42 | $34.17 |
| SOFT FLOOR LAYER | $57.42 | $34.17 |
| per hour additional for each additional fifty feet thereafter | $58.84 | $35.06 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $62.90 | $39.31 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) CABLE SPLICER | $73.59 | $45.99 |
| of his or her hourly rate for all hours worked | $45.14 | $27.46 |
| of his or her hourly rate for all hours worked | $57.01 | $27.61 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $52.88 | $37.50 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 |
| PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 |
| IRONWORKER: REINFORCING | $49.94 | $50.32 |
| contamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants) | $28.37 | $21.62 |
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 |
| LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 |
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 |
| PAINTER (BRUSH & ROLLER) | $45.55 | $29.86 |
| PAINTER (SPRAY) | $45.55 | $29.86 |
| per hour additional | $52.68 | $31.29 |
| PLASTERER | $54.64 | $30.95 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $62.09 | $45.05 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION) | $56.34 | $50.80 |
| ROOFER (SHINGLES, SHAKE AND TILE) | $44.52 | $32.25 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $67.97 | $39.35 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $51.30 | $51.55 |
| ROOFER, EXCLUDES SHAKE & SHINGLE, AND TILE ROOFS | $30.21 | $15.25 |
| one day of the calendar week during which the holiday occurs | $46.41 | $31.82 |
| one day of the calendar week during which the holiday occurs | $46.51 | $31.82 |