Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
gs and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement)$51.74$46.20
per hour additional$49.60$37.96
CEMENT MASON$49.60$37.96
TILE SETTER$64.90$37.28
per hour additional for each additional fifty feet thereafter$57.42$34.17
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)$57.42$34.17
SOFT FLOOR LAYER$57.42$34.17
per hour additional for each additional fifty feet thereafter$58.84$35.06
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING)$62.90$39.31
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) CABLE SPLICER$73.59$45.99
of his or her hourly rate for all hours worked$45.14$27.46
of his or her hourly rate for all hours worked$57.01$27.61
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$52.88$37.50
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$56.59$37.50
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$58.22$37.50
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$60.13$37.50
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY$61.72$37.50
IRONWORKER: STRUCTURAL AND ORNAMENTAL$52.24$50.32
IRONWORKER: REINFORCING$49.94$50.32
contamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)$28.37$21.62
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE$36.50$30.22
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN$35.75$30.22
DRYWALL FINISHER/TAPER$44.87$30.15
PAINTER (BRUSH & ROLLER)$45.55$29.86
PAINTER (SPRAY)$45.55$29.86
per hour additional$52.68$31.29
PLASTERER$54.64$30.95
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$62.09$45.05
PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION)$56.34$50.80
ROOFER (SHINGLES, SHAKE AND TILE)$44.52$32.25
SPRINKLER FITTER (FIRE SPRINKLERS)$67.97$39.35
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION)$51.30$51.55
ROOFER, EXCLUDES SHAKE & SHINGLE, AND TILE ROOFS$30.21$15.25
one day of the calendar week during which the holiday occurs$46.41$31.82
one day of the calendar week during which the holiday occurs$46.51$31.82