Davis-Bacon
MO20260011 (Rev 1)
Coverage: Missouri • Dunklin.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $34.69 | $22.84 |
| BRICKLAYER | $31.51 | $15.00 |
| TILE SETTER | $31.51 | $15.00 |
| CARPENTER (FORM WORK ONLY) | $32.59 | $21.85 |
| CARPENTER (FLOOR LAYER) (VINYL INSTALLATION ONLY) | $40.08 | $21.85 |
| ELECTRICIAN | $49.29 | $33.64 |
| FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND CHRISTM | $62.73 | $38.44 |
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | $30.38 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | $30.38 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | $30.38 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | $30.38 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $34.47 | $24.85 |
| LABORER (BRICK MASON TENDER) | $30.48 | $14.91 |
| CEMENT MASON/CONCRETE FINISHER | $35.10 | $18.78 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 |
| MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 |
| ROOFER | $32.25 | $17.46 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.94 | $27.53 |
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) | $52.00 | $27.12 |
| TRUCK DRIVER: DUMP TRUCK | $25.57 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $34.26 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 |
| PAINTER: ROLLER | $16.44 | $6.01 |
| PAINTER: BRUSH ONLY | $16.44 | $6.01 |
| OPERATOR: GRADER/BLADE | $22.80 | $10.78 |
| LABORER: COMMON OR GENERAL | $14.92 | $7.03 |
| CARPENTER, EXCLUDES FORM WORK, AND SOFT FLOOR (VINYL) INSTALLATION | $22.46 | $7.20 |
Related Wage Determinations
View directory →Davis-Bacon
MO20260015 (Rev 1)
Missouri • New Madrid
Davis-Bacon
MO20260086 (Rev 1)
Missouri • Christian, Dallas, Polk +1
Davis-Bacon
MO20260009 (Rev 2)
Missouri • Chariton
Davis-Bacon
MO20260012 (Rev 2)
Missouri • Johnson
Davis-Bacon
MO20260022 (Rev 1)
Missouri • Scott
Davis-Bacon
MO20260023 (Rev 1)
Missouri • Shannon