Davis-Bacon
MI20260100 (Rev 1)
Coverage: Michigan • Washtenaw.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF ANN ARBOR, AUGUSTA, LODI, NORTHFIELD, PITTSFIELD, SALEM, SALINE, SCIO, SUPERIOR, WEBSTER, YPSILANTI & YORK) | $40.74 | $32.59 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF BRIDGEWATER, DEXTER, FREEDOM, LIMS, LYNDON, MANCHESTER, SHARON & SYLVAN) | $40.00 | $23.65 |
| BOILERMAKER | $43.50 | $36.74 |
| TILE SETTER | $40.53 | $23.62 |
| TILE FINISHER | $33.50 | $23.52 |
| BRICKLAYER | $40.71 | $28.21 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $42.44 | $31.43 |
| CARPENTER (FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING) | $36.76 | $21.11 |
| MILLWRIGHT | $42.92 | $39.13 |
| ELECTRICIAN | $56.05 | $30.52 |
| PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $35.29 | $25.35 |
| PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $43.63 | $25.35 |
| PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $45.34 | $25.35 |
| PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $46.31 | $25.35 |
| PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $47.17 | $25.35 |
| PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $47.99 | $25.35 |
| PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $48.29 | $25.35 |
| PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $48.79 | $25.35 |
| PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $51.29 | $25.35 |
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 |
| LABORER: PIPELAYER | $38.47 | $15.45 |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $38.11 | $15.45 |
| PAINTER: SPRAY | $26.86 | $17.66 |
| PAINTER: DRYWALL FINISHING/TAPING | $32.85 | $20.41 |
| PAINTER: BRUSH AND ROLLER | $32.85 | $20.41 |
| EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE FIRST FULL REGULAR SCHEDULED WORK DAY FOLLOWING THE HOLIDAY, PROVIDED THE EMPLOYEE IS PHYSICALLY ABLE TO WORK | $42.00 | $25.55 |
| CEMENT MASON/CONCRETE FINISHER | $32.23 | $22.11 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $51.30 | $25.87 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $51.30 | $25.87 |
| ROOFER | $42.67 | $21.62 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $53.57 | $33.95 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $42.51 | $35.77 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| PER DAY | $31.28 | $0.70 |
| PER DAY | $31.18 | $0.70 |
| PER DAY | $31.03 | $0.70 |